NBS Source
I'm a manufacturer

"egger building"

1,133 results found

Sort by:

Showing 289-291 of 291

Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”
Sponsored
Flower Power HQ

Flower Power HQ

ECOCLEAN

PROJECT NAMEFlower Power HQLOCATIONErskine Park, NSW – AUCOLLABORATIONFlower Power Head Office TeamBRIEFFlower Power is one of Australia’s leading garden centres. They wanted an earth-friendly and sustainable solution to keep the Flower Power head office as healthy and safe as possible for staff members.MATERIAL & APPLICATIONECOCLEAN Antiviral coating was applied to the interior office building and common touchpoints.OUTCOMEECOCLEAN is not only providing long-term protection from the spread of viruses but preventing the spread of bacteria, mould, and VOCs creating a safer and healthier workplace for the Flower Power team and staff members.TESTIMONYAt Flower Power, sustainability and safety have always been important to our garden centre business. So, when the ECOCLEAN team showed us how their clever coatings could help keep our workplace safe, it was a no-brainer for us to try them. Now more than ever we have a responsibility to keep our workplaces and each other safe.John Summit, CEO Flower Power
Sponsored
Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Hempel

With a glass façade symbolising the transparency of justice and a glossy metal exoskeleton, the new Maison de l’Ordre des Avocats (House of the Paris Bar Association) is a stunning addition to the French capital’s new Batignolles judicial city. For the building owner, safety is a top priority. Therefore, the exoskeleton needed a proven passive fire protection coating that would enable the steel to maintain its load-bearing capacity for up to 60 minutes during a fire, giving those inside valuable extra time to evacuate.The challenge Specialist paint application and surface treatment company ROTH & Cie was contracted to apply the passive fire protection coating system. ROTH & Cie has worked with Hempel for many years and was keen to work with us on this project. However, due to the project schedule, the tubular exoskeleton framework was delivered to the construction site with a competitor’s epoxy primer already applied. ROTH & Cie therefore wanted a Hempel passive fire protection system that would work with the existing primer. Also, as building aesthetics are important in the overall design, the exoskeleton needed a high-quality matt satin finish. The solution Our solution was to specify a system of Hempafire Pro 315 and Hempathane 55750. A single component intumescent coating, Hempafire Pro 315 complies with the EN 13501-2 standard for the fire classification of construction products. It is optimised to provide 60 minutes of passive fire protection, as well as partial protection up to 90 minutes. In addition, thanks to its exceptionally low loadings, Hempafire Pro 315 requires significantly lower dry film thicknesses than competitor products. As a result, ROTH & Cie could apply the coating in a thinner coat, significantly reducing paint consumption, application time and project costs. The full system was completed with Hempathane 55750, a polyurethane topcoat with quick crosslinking properties that provides the matt satin appearance required by the specifications. Our dedicated passive fire protection R&D Centre in Barcelona, Spain verified that Hempafire Pro 315 could be applied on top of the existing primer. The entire system was spray applied using an electric airless pump, which is ideal for construction sites as it does not require an air compressor. The project is just another in a long line of successful collaborations with ROTH & Cie, which also include previous passive fire protection coating projects, most notably La Halle Secrétan covered market and La Samaritaine department store, both in Paris.At a glance Project Name: Maison de l’Ordre des Avocats (House of the Paris Bar Association) Customer: ROTH & Cie System: Hempafire Pro 315 + Hempathane 55750 Volume: 4,080 litres

Showing 289-291 of 291

Feedback