NBS Source
I'm a manufacturer

"access equipment and safety systems"

1,432 results found

Sort by:

Showing 289-319 of 319

Sponsored
Family Connections, VIC

Family Connections, VIC

Capral Aluminium

Steve Domoney Architecture took on the challenge of designing a home for clients with children. This project came with a clear vision of a spacious family home, contemporary in line and warm in tone. The dining room has Capral AGS windows opening at exterior ground level to a fernery, while high-level Capral AGS 419 Flushline Framing System beyond the kitchen provides views to distant trees in the south-east. The formal lounge opens to a generous decking and garden behind.
Sponsored
Cockburn Central Complex, WA

Cockburn Central Complex, WA

Rondo Building Services Pty Ltd

Mixed-use residential/commercial complexes take the saying ‘home away from home’ to a whole new level. Rondo has provided ongoing technical support with weekly site visits, as well as coordinating with long time Rondo users AN West Contractors. Supplying this unique project with Rondo Steel Stud and Track and KEY-LOCK Systems, Rondo have ensured that any onsite issues have been successfully addressed with the support of Rondo’s technical and design team.
Sponsored
Leopold Apartments, VIC

Leopold Apartments, VIC

Rondo Building Services Pty Ltd

Occupying a 2134m2 block of premium land, Leopold residential apartments is one of the newest commercial/residential developments in Melbourne’s residential and business district. The project involved the internal demolition of existing commercial fit out, the construction of an additional six levels and the fit-out of 174 residential apartments as well as four office tenancies. The works undertaken comprised of a new wall facade, the attachment of 97 new balconies to the existing structure, and installation of a structural steel transfer level with lightweight floor system (Powerscope).
Sponsored
Minter Ellison, Sydney

Minter Ellison, Sydney

SAS International Australia

Minter Ellison's award-winning office specified SAS International ceilings as part of their overall workplace well-being strategy. Designed by BVN, the feature ceilings enhance the open floor design while minimising the use of materials. BVN challenged internal preconceptions of how major law firms present themselves to staff and clients alike. Deliberately shying away from a stiff, corporate feel, they specified SAS750 Tubeline in black. Their aim was to evoke a sleek and forward-thinking dynamism while maintaining a highly professional atmosphere. Elsewhere in the office areas SAS310 metal pan ceilings were specified with an unusually large perforation. This design feature creates a visually engaging ceiling which offers subtle system integration for sprinklers, down-lighters and other small services. Due to a tight project programme, micro-perforated SAS150 was specified knowing the tiles were readily available in the Sydney warehouse. The system satisfied acoustic absorption requirements too, achieving 0.95 NRC. Minter Ellison invested in not just a Grade A office redevelopment, but also their staff, improving motivation and retention. The reinvigorated space also communicates a clear sense of approach to visiting clients, underlining core brand values. Occupying the top 8 floors of the Governor Macquarie Tower, the project won the 'John Verge Award for Interior Architecture (NSW Architecture Awards) in 2016.
Sponsored
Fresh Floor Finish for Orchard Manufacturing

Fresh Floor Finish for Orchard Manufacturing

Flowcrete

Orchard Manufacturing is an Australian health company that has been producing fruit-based laxatives under the Nu-Lax brand, since 1937.The organisation’s new state-of-the-art, purpose-built facility - located in the Victorian suburb of Rowville - delivers both superior function and out-of-the-box design as well as providing a new home for the long-time Melbourne-based manufacturer.To ensure the new facility’s processing and packaging zones met the strict hygiene standards, 1, 300 m2 of Flowfresh SR was installed in Warm Buff, Grey and a custom Aqua Blue shade.The HACCP Internationally certified Flowfresh SR system was chosen thanks to its seamless, antimicrobial finish as well as its abrasion and chemical resistant profile.Flowfresh SR provides excellent chemical resistance against detergents, oil ingredients, caustic soda, sugar syrups, methanol and a variety of acids. The system delivers excellent abrasion resistance against impact as well as sustained foot and trolley traffic.Flowfresh SR is resistant to thaw and thermal fluctuations from -40°C to +120°C, making it suitable for cool rooms and cold storage areas as well as those areas subject to high-temperature cooking processes and hot-water wash-downs. Slip resistance can be tailored to suit the individual needs of a given processing area.
Sponsored
Adagio Apartments, WA

Adagio Apartments, WA

Capral Aluminium

The term ‘adagio’ is an instruction to slow down and function at a leisurely pace, which makes it an appropriate name for the recently completed apartment complex. Designed by Hanssen Pty Ltd, minimalist design principles are apparent in the building’s sleek lines, as evidenced in the strong use of high-performance window systems, doors and balustrades; low-maintenance aluminium framing; and a simple linear design promoting an outward-looking connection to the environment. The affordability, strength, adaptability and quality of manufacture of the Capral Apartment Collection made it our ‘material of choice’ for the Adagio high-rise.
Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
Upper Yarra Secondary College

Upper Yarra Secondary College

BRITEX Metal Products

Britex are proud to be involved in another successful VSBA School Upgrade Project at Upper Yarra Secondary College in Yarra Junction, Victoria. The completion of Stage One of the College’s Upgrade and Modernisation Project saw the inclusion of almost 30 Grade 316 SS Acid Resistant Britex Laboratory Bowls for their state of the art science and technology facilities throughout. A floor mounted 3.5m Vandal Resistant Sanistep Urinal was also installed in the Male Bathrooms complete with Smart Saniflush Sensor Flushing System, a water efficient and hygienic choice ideal for education projects.
Sponsored
ABC Melbourne Office, VIC

ABC Melbourne Office, VIC

Capral Aluminium

The ABC project in Melbourne’s Southbank precinct represents a bold union of the national broadcaster’s multiple aims and responsibilities. With its bold style, internal and external openness and highly innovative use of technology, the ABC’s Victorian headquarters embodies socially responsible design. The central design theme of transparency is perfectly suited to the Capral curtain wall, window and door systems throughout. The building, which designer Cox Architecture characterise as fostering a ‘dynamic, integrated and visually transparent environment which promotes interaction across program teams’, also invites ‘greater public interest and participation’.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
RMIT Swanston Street Campus, VIC

RMIT Swanston Street Campus, VIC

Rondo Building Services Pty Ltd

Expoconti and Rondo, along with the project architects, Lysons Architects and builder, Brookfield Multiplex, combined their expertise to ensure the design and construction of the RMIT Swanston Academic Building (SAB) offers a higher quality and innovative learning experience for students. To achieve this, the newly launched Rondo MAXIframe External Wall Framing System was specified, with Rondo MAXIjamb designed for installation around door jambs and internal window openings. This meant Expoconti could save time on site as MAXIjamb replaces the necessity for multiple stud configurations, as well as offering greater performance capacities than traditional wall stud framing.
Sponsored
Rosewood Aged Care

Rosewood Aged Care

Markham Global PTY LTD

There were two sets of challenges involved in the Rosewood Aged Care.Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.
Sponsored
Deakin University - Waterfront Student Accommodation

Deakin University - Waterfront Student Accommodation

ECOCLEAN

COLLABORATIONArchitect: ThomsonAdsett in collaboration with nettletontribeBuilder: L.U.SimonDeveloper: Deakin UniversityBRIEFThe Waterfront campus for Deakin University at Geelong celebrates the “individual” student through the prominent white precast concrete. The client on this project wanted to ensure that over time the white concrete stayed pristine – looking as good as new – without expensive cleaning and maintenance costs.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEOur ECOCLEAN Self-Cleaning system has been applied to the concrete to preserve the appearance of this building’s prominent facade. This significantly reduces cleaning and maintenance costs making this a cost-effective and net positive environmental solution.
Sponsored
The Berkley Hotel

The Berkley Hotel

Boon Edam Australia Pty Ltd

The Berkeley Hotel is a luxurious and iconic hotel, housed in the fashionable district of Knightsbridge, London. When renovations were required, Roger Stirk Harbour & Partners designed a glass façade entrance to the hotel. Boon Edam Ltd was consulted to provide a stylish entry solution to complement the updated lobby entrance and reflect the luxurious image of the Berkeley Hotel brand. Business Challenges The hotel entrance required a renovation which would give guests an instant welcome upon arrival, whilst also providing a practical function to meet access needs. For a hotel as prestigious as The Berkeley, first impressions are hugely important. The entrance and welcome given by a hotel provides the guest with an indication of what to expect from their stay, so therefore the entry solution was a key consideration within the renovation project. With a constant flow of visitors in and out of the lobby, the entrance door is vital in maintaining a comfortable climate and pleasant atmosphere for guests. As sliding or swinging doors bring in cold draughts, the specification called for a revolving door to keep out wind, noise and dust. The project architect specified that the door was to be fully automatic and made entirely of glass to match the newly renovated lobby. However, for a door to be fully automatic, there must be several sensors and buffers which would have impacted the all-glass aesthetic of the entrance. Boon Edam was appointed to provide a tailored solution which could meet all the specific functional requirements, without needing to compromise on the luxurious style and quality desired. The Boon Edam Solution A Custom Designed Crystal Tourniket Due to the high-end nature of The Berkeley Hotel, attention to detail was paramount. Multiple meetings were held with the architect to ensure that Boon Edam’s team of experts could fully capture all requirements to provide the perfect, bespoke solution. Boon Edam’s Crystal Tourniket door was selected for the entrance of The Berkley Hotel; one of the most impressive and eye-catching revolving doors available. A Crystal Tourniket is constructed almost entirely from glass, with added stainless steel accents to support the solidity of the door. The End Result The Berkeley Hotel is now home to a grand lobby entrance provided by Boon Edam, which utilises natural wood in the drum wall of the Crystal Tourniket revolving door to provide guests with a warm and elegant welcome. In combination with the all-glass door set and modern lighting, the bespoke solution truly reflects the prestigious Berkley Hotel brand.
Sponsored
Margaret Whitlam Grandstand – Waverly Oval

Margaret Whitlam Grandstand – Waverly Oval

Tremco

​About the ProjectThe sporting history of Waverly Oval dates from the 1880s when the Waverley Cricket Club gained approval to construct a pitch. Football codes also began using the park at this time. In 1890, the oval was created, and in 1898 the Waverley District Baseball club was founded at the oval.The first pavilion was built by the Waverley Cricket Club in the 1890s and Council built a second pavilion in 1908 with expanded facilities for the benefit of the cricketers and the public. This Pavilion was replaced in 1939 with an Inter War Functionalist style building. In April 2012 the new Waverley Park Pavilion was named the Margaret Whitlam Recreation Centre, in honour of the long association the late Margaret Whitlam (AO) had with the Waverley area. The pavilion was chosen because of its civic, community and recreational facilities incorporating several important aspects of Margaret Whitlam’s life.ProblemRemediation of the pedestrian areas of Margaret Whitlam Grandstand was completed 5 years ago but unfortunately was not successful due to product failure (not Tremco). Council contacted Tremco to provide an acceptable solution with the requirements that the new system needed to come with a 15 year warranty.The challenge of this project was not the 15 year warranty period, but the need for a low odour solution due to the area being in a Public/Government venue. Not all membranes have Low VOC properties.SolutionTremco recommended Vulkem 350/951NF/951NF for the job, which is not only low odour but also offers a 15 year warranty period as required from the council. Tremco offering onsite support throughout the project gave the council confidence in our product.Vulkem 350/951NF/951NF, is a composite waterproofing system comprised of tough-curing liquid polyurethane. It cures to form a durable rubber membrane surface that provides a lasting and easy-to-clean waterproof and trafficable coating. Textured surfaces for traffic will use an aggregate-laden top membrane to aid in wear and slip resistance.
Sponsored
Cork County Council Office, Cork

Cork County Council Office, Cork

SAS International Australia

SAS International provided an unusual feature perforation to a metal ceiling solution for Cork County Council’s redevelopment of their MOT office. The refurbishment of Cork County Council has created an outstanding open plan office for their upgraded MOT Office. Included in the redevelopment is the installation of 240 meters squared of acoustic SAS500, with a unique OB50 perforation, installed within the open plan office, meeting rooms and cellular offices. Conserving the original architectural features was significant when embarking on the reconstruction of the building. SAS500 was chosen to accommodate the spacing of existing structural beams, the system hung on secondary grids to adhere to specific architectural requirements. To adhere to the recent popularity in open soffit trends, SAS500 offers a solution in addition to providing acoustic absorption. A unique OB50 perforation was specified in the design of the baffles for this project. SAS International worked in collaboration with Cork County Council Architects and CField Construction to provide bespoke design solutions for this project.
Sponsored
Folia Apartments.

Folia Apartments.

Sculptform

The word Folia in Greek means nest, and this is precisely what Folia apartments by Mirvac have delivered. Foliage adorns the many balconies, rooftop conservatory and kitchen garden, contributing greatly to the tranquil ambience which feels wholeheartedly organic. The residences are an inviting place to call home for their new occupants. Able to be seen from below are the prominent soffits on floors 5 and 6, lined with our aluminium Click-on Cladding in a strikingly realistic Blackbutt wood finish. The wood finish on the cladding appears abundantly realistic, cleverly achieving the look of real timber in both tone and texture. Our wood finish wrapping is produced in Japan using a state of the art system to ensure that there is no repetitive wood grain pattern present, helping it to achieve the aesthetic variation of real timber. It also features an embossed texture further replicating that of real timber along with the shadow lines which imitate traditional timber cladding.
Sponsored
West Side Place - Stage 1, Towers 1 & 2

West Side Place - Stage 1, Towers 1 & 2

Bostik Australia Pty Ltd

At Bostik, innovation comes in many forms.Ultraset® 3 in 1 is Bostik Australia's premium timber floor adhesive incorporating Thickness Control™ Spacer Technology, a proprietary feature consisting of recycled, ground-up car tyres mixed throughout the adhesive.When applied, the Thickness Control™ Spacers act like tiny rubber pillars, suspending the timber and maintaining optimal adhesive thickness to ensure superior performance as a moisture and impact sound reduction membrane.For West Side Place, Ultraset® 3 in 1 presented significant time and cost savings vs conventional multi-layer acoustic systems by eliminating the need to install a separate moisture barrier, acoustic underlay and additional layers of adhesive. Efficiencies that flowed directly onto the construction team, supporting trades and ultimately the developer, delivering a high performance solution within budget, ahead of schedule all the while guaranteeing a compliant and comfortable environment.
Sponsored
Functional Coatings - Parramatta Leagues Club Carpark

Functional Coatings - Parramatta Leagues Club Carpark

ECOTONE

CollaborationArchitects: HassellBuilder: ADCO ConstructionsBrief Protection of the carpark’s white appearance from staining, soiling and future graffiti strikes.Material & ApplicationECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOutcomeAfter a number of years since application, the car park continues to self-clean and keep its as-new white appearance through the photocatalytic properties of our ECOCLEAN dual coating system. Harmful compounds are continuously broken down when they come into contact with a coated surface in addition to benefiting from graffiti resistance.Testimonial“This is an example of our functional and protective coatings removing the barriers to having white or fair-faced concrete or cladding in building designs. Their self-cleaning, anti-carbonation, anti-fungal, and graffiti resistant properties mean buildings look as good as new, enabling fresher and lighter colours to be more prevalent in our built environment.”Tony Watling, CEO ECOTONE & ECOCLEAN, Australia & New Zealand
Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
Dallas Police Department, Dallas Texas, USA

Dallas Police Department, Dallas Texas, USA

Boon Edam Australia Pty Ltd

There is a saying that “Everything is Bigger in Texas,” and the Dallas, Texas police department is no exception. The city of Dallas is ranked in the top 10 cities in the U.S. in terms of population, at 1.2 million people. The Dallas Police Department is the ninth largest municipal police force in the U.S., based on 3,012 sworn officers. It is led by Chief of Police, U. Reneé Hall. Security a Concern When Designing HQ Building The department is located in the Jack Evans Police Headquarters building, which was built in 2003. It is 358,000 square feet, has six floors, is spread over a three-acre site, has a separate 1,200 car parking garage and a two-acre, open parking lot for additional visitor parking. Prior to 2003, the department was housed in the circa 1914 former City Hall Building. The Jack Evans Police Headquarters building was under construction when 9/11 terrorists flew airplanes into the World Trade Buildings in New York. That event was preceded by the Oklahoma City Murrah Federal Building bombing in April 1995. Therefore, security was a concern in its design. Police officials worked with a Police Design Consultant – McClaren, Wilson, and Lawrie Architects of Phoenix – to help design the building to resist a terrorist attack and isolate potential hazards. The building also needed to control visitor traffic and access. On an average month, there are 5,000 public visitors to the Jack Evans building. In addition, shots fired at police buildings nationally are not uncommon, says Paul M. Schuster, Senior Corporal/Facilities Management for the Dallas Police Department. “For the most part they are random, single shot drive-by shootings. Often, the officers are unaware that the building has been shot at, until they find a bullet hole in the brick or glass. Increasingly, police tend to be a symbol of government and some citizens see that as a visible target to lash out at. Police officers are trained to expect the routine types of calls, such as domestic violence, traffic accidents, and other crimes. Yet they must be flexible to anticipate the non-routine that can be dangerous and change in a heartbeat.” An Active Shooter Incident Led to an Increase in Security On June 13, 2015, after midnight, a 35-year-old male placed a duffle bag with a remote-controlled bomb to detonate later between cars in the parking lot of the headquarters building. The suspect then began shooting continuously at the lobby windows. Officers responded to the scene, a vehicle chase began, and the incident ended outside the city. Luckily officers in the lobby took cover and were not injured. Following that incident, the Dallas Police Department conducted a security assessment of the building and also at seven patrol stations throughout the city. The assessment included testing various construction materials for bullet resistance to various types of weapons. Gensler Architects and Guidepost Solutions, LLC developed the solutions and plans. “Yesterday we were concerned about handguns, today we are worried about rifles, and the idea of terrorism is always present with outright attack or bombs,” Schuster notes. “The police officers and police staff only want a place that is safe and where they can do their good work.” Funding of $1.3 million was approved to upgrade the lobbies of the seven patrol stations to withstand rifle rounds, and $1.9 million to improve headquarters lobby security, and to upgrade an aging security system. Turner Construction Company and Convergint Technologies, LLC conducted the renovations and security technology integration. Challenges to the Security Design The headquarter’s lobby was initially designed as a two-story glass-walled structure, with an information desk and public records service windows. Visitors were allowed free entry into the lobby and were only screened in an open area to the side if going to other floors. “The challenge in upgrading lobby security was the two-story lobby entrance glass. “In addition, there were concerns about keeping an ‘open’ and friendly service concept in mind and ensuring that the lobby would not resemble a ‘fortress’,” Schuster notes. Screening Room with Security Revolving Doors to Contain Incidents The solution was to keep the existing exterior unchanged and focus on adding a layer of security once a person enters the lobby. Visitors now enter the headquarters and immediately proceed to a side room where security screening is conducted. A new secondary wall with bullet-rated glass and solid bullet resistant wall materials was constructed inside the lobby to channel visitors to the room. Once inside the screening room, which also has bullet resistant walls, the visitor has belongings x-rayed, and they walk through a metal detector. In the event that anyone was to produce a gun and begin shooting, the incident could be contained inside that room. Once a visitor has been cleared, they proceed into the main lobby via a Boon Edam Tourlock 180 security revolving door. This automatic, four-wing door is the most advanced, security revolving door in the Boon Edam product range that offers maximum throughput, allowing users to enter and leave the building simultaneously. In the event that a large number of persons try to force their way into the facility, the Tourlock 180+90 will determine that more than one person is trying to enter and will reject the person and lock out any others from entering. Once a visitor is ready to leave the lobby and exit the building, they pass through another Boon Edam Tourlock 180+90 that leads to a vestibule with exterior swinging doors. In the event that someone tries to go back into the lobby from the front vestibule area, without going through the security screening room, the Tourlock security revolving door will reject their entry.
Sponsored
Jewel - Gold Coast

Jewel - Gold Coast

Mapei Australia Pty Ltd

Jewel on the Gold Coast (Jewel), a luxury development of three crystalline towers constructed on the internationally renowned Surfers Paradise beachfront, Gold Coast. Jewel consists of 513 apartments and a 169-room luxury hotel – a first of its kind on the Gold Coast. The towers with their distinctive glass curtain walling system, are the result of a collaboration between Oppenheim Architects and DBI Design. The fundamental design concept drew inspiration from three smoky quartz crystals that we discovered in the region. Jewel is inspired by the crystalline volcanic hook that forms the underlying structure at the coastline and, in particular, the Gold Coast’s iconic hinterland. Multiplex was awarded this prestigious project and commenced construction of this billion-dollar development in 2016. The Jewel is Australia’s largest beachfront mixed-use development and the first absolute beachfront development on the Gold Coast in more than thirty years. Tilecorp Pty Ltd. was awarded the tiling contract on the project that included the installation of 600 x 300 mm porcelain tiles in the public areas, travertine in the apartments, penny round mosaics on the walls in the public amenities, and cobblestone in the outdoor areas.
Sponsored
RMS Parramatta, New South Wales

RMS Parramatta, New South Wales

SAS International Australia

The Roads & Maritime Services (RMS) now benefit from a highly progressive workspace in their newly refurbished head office on Parramatta Street. The main aim of the refurbishment project was to improve facilities and collaborative spaces for staff and visitors. However, a significant challenge for the contractors was to keep all existing communications rooms fully operational throughout the project. Achieving the Aim: SAS800 Trucell ceilings were installed in the open plan lounges and stairwells of the renovation. Creating a grid of squares, strong lines stretch the length and breadth of the collaborative space. The system gives a decorative feature to the fit-out with the illusion of a much larger space for activity-based working. Comfortable lounge furniture and bright colours have also been chosen to encourage communication and create a flexible working space. Meeting the Challenge: Specified with a lay-in exposed grid, each tile slots in place without the need for gaskets or cutting. With the building in constant use, installation was quick and easy keeping the project on schedule with minimal disruption. Popular in Australian CBD property markets, the refit considers occupant well-being with Grade A ‘end of trip’ facilities. An upgraded lobby area also contributes to the value-added space with an improved experience for employees and visitors alike.
Sponsored
Qantas Headquarters, Mascot, Australia

Qantas Headquarters, Mascot, Australia

SAS International Australia

7000m² of SAS310 helped Qantas Airways overcome acoustic challenges, controling reverberation time and meeting a very high acoustic performance target. Qantas Airways Limited, nicknamed ‘The Flying Kangaroo’, is Australia’s largest airline. The new headquarters is the largest property project undertaken by Qantas Airways in the last 10 years. The project aims to rejuvenate the existing campus, consolidating and upgrading four existing office buildings and joining them together with an interconnecting hub. Selected areas of the existing building floorplate have been extended into the new atrium space creating balconies and office pods. These improved physical and visual connections aim to encourage interaction and engagement between workers. With a brief for high acoustic performance, SAS International were an obvious choice for Hassell architects, due to our vast portfolio of high acoustic rated metal ceiling tiles. SAS provided 7000m² of SAS310. The acoustic challenge was to control the reverberation time in a large volume space accommodating a PA system and a very high acoustic performance target. The reverberation time was significantly reduced with the addition of absorptive material and purposed designed acoustic ceiling panels. Qantas Headquarters was constructed with longevity in mind so the durability of the tiles was key, an advantage of using metal. The finish completely meets the performance demands, is extremely functional and cost effective, an A Grade corporate campus that incorporates the latest developments in sustainability and energy efficiency.
Sponsored
Warwick Hotel, Rittenhouse Square - Philadelphia

Warwick Hotel, Rittenhouse Square - Philadelphia

Boon Edam Australia Pty Ltd

Warwick Hotel Rittenhouse Square in Philadelphia, PA, is quite satisfied with the functioning and cost savings of their Boon Edam Tournex revolving door. The Tournex is an example of a classic automatic revolving door and is designed to handle high capacity applications. The historic building housing the Warwick Hotel Rittenhouse Square originally had a manual revolving door flush with the building’s facade. Somewhere along the way, it was decided to remove the relatively smaller gauge revolving door and replace the entrance with a double set of sliding doors. “Our HVAC system was designed for a revolving door entrance,” said Ray Hewitt, the hotel’s Director of Engineering, “we wanted to put a revolving door back in to address the negative pressure we were experiencing in the lobby.” That negative pressure was pulling in cold air during the winter months, and cooled, conditioned air was escaping out the double doors in the summer. During a complete lobby renovation project a few years back, designers worked to return to a revolving door lobby entrance. Because the Warwick is in a historic building, they could not change the facade of the building, so they pushed the entire entrance into the lobby itself. The architects and the designer chose a 12’ diameter Boon Edam Tournex automatic revolving door, with three door wings and a highly polished (mirror) stainless steel finish. The Boon Edam door is enclosed in a stylish glass cube, accented with purple neon lighting. Now, those entering the hotel first pass through a double set of sliding doors at the building envelope, leading to the revolving door. Swing doors are also available on either side of the revolving door to enter the lobby itself. The effect of the sliding doors and the revolving door in a cube is to virtually eliminate air flow from outside in, and vice versa. The Warwick has 301 hotel rooms and 106 permanent residents. On any given day, between guests, residents, staff, and visitors, up to 1000 people are passing through the entrance. Since the installation of the new entrance, the effect has been night and day—guest and visitors utilise the lobby space longer and in greater numbers. A big community table is usually filled all day long and the lobby is accented with attractive fireplaces. The hotel lobby also offers two full service food and beverage outlets (Bluestone Lane & Prime Rib Steakhouse), with a third to be announced sometime this year. In addition to a now grand sense of arrival and more useable, comfortable space, the new entrance is also paying dividends on energy savings. “With the old entrance, our HVAC was running constantly, it could not keep up. Now, the unit can shut down periodically; that’s good for the health of the system, and we’re seeing substantial savings on energy bills,” said Hewitt. The Boon Edam revolving door has an important feature for installations like a hotel or large office building—in the event of an emergency, the doors stop and the wings can be “book folded” to create wide open ingress and egress. The hotel has a maintenance contract with Advanced Door, but since installation the Boon Edam revolving door has been virtually trouble free.
Sponsored
Ropemaker Place, London

Ropemaker Place, London

SAS International Australia

SAS International bespoke metalwork comprising of a striking waveform shaped ceiling was designed by architects Arup Associates to feature in the construction of Ropemaker Place, London EC2 for British Land. Simon Anson, architect at Arup Associates comments; “The purpose of the ceiling was to provide the 10.5m tall entrance foyer with an acoustic performance, and create a lighting source providing both uplight and downlight. The illuminated ceiling provides the entrance foyer with visual impact from views of City Point Plaza, Ropemaker Street and The City.” Simon Anson continues, “The appearance of the ceiling is that of a series of illuminated vaulted waves flowing into the interior, the volume of the space perceptually expanded by the uplit waveform surfaces. The vaulted ceiling with its flowing contours provides a visually stunning focal point as well as a practical solution to the acoustic requirements of the interior of the building.” Specialist bespoke wave ceilings were installed in the atrium, main reception area, lift lobbies and main external canopy. The waveform panel, although elegant in appearance, had to have the required strength to support the light fitting. The extra weight posed a significant design challenge of how to integrate and support the light fitting into the waveform panel. The complex design required all fixings to be concealed, as a large proportion of the face and rear of the waveform tiles are visible. In the design development and installation of the system, Arup Associates worked closely with SAS International and the specified lighting manufacturer, Zumtobel, to ensure the panels integrated seamlessly with the luminaires to produce the optimum installation.
Sponsored
Skype, Luxemborg

Skype, Luxemborg

SAS International Australia

SAS International's bespoke waveform acoustic baffle ceiling solution was used as a feature in the new Skype Headquarters. An SAS International bespoke waveform acoustic baffle ceiling solution incorporating luminaires by Zumtobel, was specified by Walker and Martin Architects (WAM) for the new Skype Headquarters. Situated in Luxembourg, the new building forms part of the regeneration works to an existing brewery located in Clausen, the old quarter of Luxembourg City. The challenge set by the client was to provide an interior that would inspire innovation in the daily workplace of Skype employees whilst retaining an element of corporate sophistication. The solution helped create a dynamic and flexible office space. In the design, development and installation of the system, WAM worked closely with SAS International, to ensure the baffles integrated seamlessly with the luminaires to suit the ceiling and building shape. WAM designed the acoustic baffle ceiling solution with technical help from SAS International, then developed the layout to achieve the ‘wave’ and ‘fluid’ affect. Stuart Walker adds, “The ceiling design gives an uplifting ambience to the space, people ‘look up’ when they enter and immediately know they are in a space that challenges office convention with innovative thinking.” Another consideration that WAM took when selecting materials for the fit out process was the impact on the environment. SAS International metal ceilings have a lifespan in excess of 25 years with only very basic maintenance. These products withhold a residual value and can be recycled at end of life into new virgin steel or aluminium without any loss of properties; this ensures products do not end up in costly and unsustainable landfill sites.
Sponsored
One New Change, London

One New Change, London

SAS International Australia

One New Change features SAS International bespoke metal ceiling panels with an expanded metal mesh, finished in silver, red and black. The ground-breaking, bold and perceptive £300 million One New Change mixed-use development project won the MIPIM AR Future Project Award 2010. Now complete, the building has become known as the ‘Stealth Bomber’ after the radar-proof combat plane that inspired its faceted form and has also won a RIBA 2011 Award for London and LDSA Building Excellence Award. The design incorporates pedestrian arcades converging at the core of the building, reinstating a historic north-south pedestrian route and allowing new panoramas of London’s landmark St Paul’s Cathedral. SAS International supplied the ceiling solution for the retail corridors of the development with a concealed suspension system, working closely with the architects to create a result where no visible fixings can be seen through the ceiling plane. To complement this, bespoke metal ceiling panels were produced with an expanded metal mesh, finished in silver, red and black. A challenging material to work with, to ensure the mesh held a uniform shape and corners for the panels could be formed accurately, SAS International’s solution was to create a ‘picture frame’ behind each panel. This also helped to provide support for the concealed attachment bolts. Design challenges at One New Change included the building grid size and shape (it was termed the most difficult site in Europe), the complex geometry of the structure (including some tight ceiling to structural beam heights), and a shared fire strategy between retail and office storeys. Requirements to achieve an environmentally-friendly building, complying with Part L and BREEAM ratings, were also critical and the design uses a materials palette of limestone, metal, mirror and a new method of fritted glass on the exterior to help shield the interior from glare.
Sponsored
Sea Temple Apartments

Sea Temple Apartments

Tremco

About the ProjectSea Temple is unrivalled as THE 5-star resort in Port Douglas. The beautifully manicured grounds, stylish accommodation, world class facilities and spectacular 3000m2 central swimming lagoon, places Sea Temple in another league when compared with other resorts in the region. Sea Temple Luxury Apartments is a collection of 6 stunning 2 and 3 bedroom Swim-out and Penthouse apartments within the Pullman Sea Temple resort complex. The apartments have been selected for their ideal positions within the resort, relaxed atmosphere and unparralled quality facilities set the scene for pure enjoyment.The ChallengeWhen you are working with one of the most prestigious resorts in Port Douglas where the highest quality of facilities, services and experiences are expected, you need to provide unparalled results. Also when your guests are paying a premium price, your solution needs to be low odour so as to not disrupt the experience of paying guests whilst the work is being completed. The harsh North Queensland conditions demand a high quality product strong enough to withstand all types of weathering. So when Sea Temple Apartments discovered a problem with their waterproofing a high quality but aesthetically pleasing solution was the only option.Tremco SolutionWith the contractor previously using liquid membranes, a more robust and durable solution was needed which would also provide the warranty, demanded of a high quality building such as Sea Temple.Having previously completed many other successful projects with Tremco Systems, the applicator had trust in the Tremco solution, and a dual layer of Tremproof Torch 3000 seemed the logical choice for this end high development. The low VOC and odour levels of Tremproof Torch 3000 helped seal the deal in the built up 5 star accommodation to reduce neighbourhood discomfort.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.

Showing 289-319 of 319

Feedback