You are viewing content for Australia.

Choose a country to see content for your location. Changing region will navigate you to the homepage.

NBS Source
I'm a manufacturer

"combined heat and power systems"

1,770 results found

Sort by:

Showing 217-249 of 249

Sponsored
Multi-level Apartments with Enclosed Balcony, NSW

Multi-level Apartments with Enclosed Balcony, NSW

Breezway Australia Pty Ltd

Designed by Tony Owen Partners, Breezway Altair Louvre Windows were recommended to the Developer by the Architects at Tony Owen Partners due to their visually appealing aesthetics, the products full certification and compliance with Australian Standards, and Breezway’s strong reputation in the window industry. Altair Louvres with the Stronghold System have been strategically placed on the corner of the building as a key visual feature. Being a high quality window system, Altair Louvres will provide protection from the elements and are restricted to comply with Fall Prevention requirements.
Sponsored
Sir Edward Weary Dunlop Retirement Village, VIC

Sir Edward Weary Dunlop Retirement Village, VIC

Rondo Building Services Pty Ltd

The Sir Edward Weary Dunlop Retirement Village has been completed with the help of architect, builder and contractor Ryman Healthcare. The 134-unit age care facility will house serviced care units and independent living units for the elderly with resort-style facilities. Rondo assisted in the development of this project, supplying a number of products including Stud and Track (64mm and 92mm x 0.55BMT), KEY-LOCK Suspended Ceiling Systems and MAXIjamb Systems for the large window and door openings leading onto balconies.
Sponsored
Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Hempel

At the new 6,000-seater Jordal Amfi ice hockey stadium in Oslo, Norway, player and spectator safety is a top priority. The stadium owner wanted a coating system which included passive fire protection, so, when Danish-based Give Steel was contracted to produce the steel structures, they had to not only meet the customer specification for fire protection but also consider the logistics of the project.The steel pieces were produced in Denmark, and Give Steel needed a coating system that was robust enough to protect the steel during transportation and erection onsite.
Sponsored
Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Hempel

With a glass façade symbolising the transparency of justice and a glossy metal exoskeleton, the new Maison de l’Ordre des Avocats (House of the Paris Bar Association) is a stunning addition to the French capital’s new Batignolles judicial city. For the building owner, safety is a top priority. Therefore, the exoskeleton needed a proven passive fire protection coating that would enable the steel to maintain its load-bearing capacity for up to 60 minutes during a fire, giving those inside valuable extra time to evacuate.The challenge Specialist paint application and surface treatment company ROTH & Cie was contracted to apply the passive fire protection coating system. ROTH & Cie has worked with Hempel for many years and was keen to work with us on this project. However, due to the project schedule, the tubular exoskeleton framework was delivered to the construction site with a competitor’s epoxy primer already applied. ROTH & Cie therefore wanted a Hempel passive fire protection system that would work with the existing primer. Also, as building aesthetics are important in the overall design, the exoskeleton needed a high-quality matt satin finish. The solution Our solution was to specify a system of Hempafire Pro 315 and Hempathane 55750. A single component intumescent coating, Hempafire Pro 315 complies with the EN 13501-2 standard for the fire classification of construction products. It is optimised to provide 60 minutes of passive fire protection, as well as partial protection up to 90 minutes. In addition, thanks to its exceptionally low loadings, Hempafire Pro 315 requires significantly lower dry film thicknesses than competitor products. As a result, ROTH & Cie could apply the coating in a thinner coat, significantly reducing paint consumption, application time and project costs. The full system was completed with Hempathane 55750, a polyurethane topcoat with quick crosslinking properties that provides the matt satin appearance required by the specifications. Our dedicated passive fire protection R&D Centre in Barcelona, Spain verified that Hempafire Pro 315 could be applied on top of the existing primer. The entire system was spray applied using an electric airless pump, which is ideal for construction sites as it does not require an air compressor. The project is just another in a long line of successful collaborations with ROTH & Cie, which also include previous passive fire protection coating projects, most notably La Halle Secrétan covered market and La Samaritaine department store, both in Paris.At a glance Project Name: Maison de l’Ordre des Avocats (House of the Paris Bar Association) Customer: ROTH & Cie System: Hempafire Pro 315 + Hempathane 55750 Volume: 4,080 litres
Sponsored
Bailey Hotel and Resort

Bailey Hotel and Resort

Mapei Australia Pty Ltd

Installation of floor and wall coverings, Sealants application, Surface preparation, Tile & stone installation systems, Waterproofing
Sponsored
Dubai International Airport - Concourse 4, Dubai

Dubai International Airport - Concourse 4, Dubai

Rondo Building Services Pty Ltd

Rondo Steel Stud Drywall Framing System will be used in the construction of the Dubai International Airport - Concourse 4 project.
Sponsored
iFly Indoor Skydiving Centre, WA

iFly Indoor Skydiving Centre, WA

Rondo Building Services Pty Ltd

Working directly with sub-contractors Donnybrook Interiors and Architectural Ceiling Systems, Rondo delivered the walls and ceilings for this unique $15million build.
Sponsored
Crystalbrook Kingsley

Crystalbrook Kingsley

ECOCLEAN

COLLABORATIONArchitect: EJE ArchitectsBuilder: Core Project GroupBRIEFDevelop the best coating system to maintain the surface appearance of the restored heritage-listed Kingsley building to align with its vision of being a true luxury hotel.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEThe ECOCLEAN coating system uses self-cleaning technology to preserve the concrete appearance of the Kingsley – the first luxury hotel in Newcastle.Winner of two Asia-Pacific Hotel of the Year awards, the Kingsley is a remarkable example of what photocatalyst coatings can do to preserve the appearance of heritage-listed buildings while reducing maintenance budgets.Images courtesy of Crystalbrook Kingsley
Sponsored
33 Congress Street, Boston

33 Congress Street, Boston

Boon Edam Australia Pty Ltd

The City of Boston is known for many things – from Fenway Park to the Boston Marathon to the bar from Cheers, the city is full of iconic landmarks, events, cultural assets, education centers, and more. The City is also recognised for its vast history, especially downtown, where hundred-year-old buildings have been preserved or restored. There is also a mixture of new property development, including 33 Congress Street, in the heart of the financial district, which combines the best of historical design with new construction. 33 Congress incorporates more than 400,000 square feet of office and retail space, transforming the historic neighborhood and positioning the area as a dynamic downtown destination. The project was designed by Arrowstreet, an award-winning architecture and design firm, and was led by Jason King, AIA, LEED, AP, BD+C, Senior Associate for Arrowstreet. Blending Historical Features with a Modern Design According to King, the 33 Congress Street building consisted of three different structures that were built at separate times: in 1904, 1906, and in 1922 and then all combined into one space. While the space functioned as one building, there were three separate elevator cores, sets of restrooms, sets of stairs, and more. Those entities needed to be reconfigured into one. The most striking feature of 33 Congress is a new, modern glass and steel structure, containing 6 additional floors of office space that sits on top of the original three masonry buildings. Another important project goal was to upgrade the main lobby to a modern design that allowed public access, increased security for building employees, and respected several historical aspects. “We needed a way to get people into the new, main elevator lobby quickly due to the high volume of traffic that we were anticipating would take place after the redesign,” King said. “We also wanted to create an entrance that would create a better flow of entry from the sidewalk into the building.” The original building had an existing revolving door, but it was small and surrounded by stone. “It was dark and uninviting,” King said. “We were creating an open and airy Class A lobby space and wanted visitors to clearly see the ornate, coffered ceiling and experience the grand and historic nature of the lobby as they entered.” Revolving Door and Speed Gates Provide Aesthetics and Function King implemented a Boon Edam Crystal Tourniket manual revolving door to lead visitors in the double height lobby space. The Crystal Tournket is constructed virtually completely from glass with only a few stainless steel accents to ensure the solidity of the revolving door. It fits seamlessly with modern glass facades but can also be a beautiful eye catcher in more traditional or classic designs. For employee access, the building’s previous design did not incorporate turnstiles to the elevator banks. “The building did have card reader access, but only at certain doors and locations,” King said. King installed four lanes of Boon Edam Lifeline Speedlane Swing speed gates and two Winglock Swing model access gates to provide secure employee access to the building’s upper floors. The Lifeline Speedlane Swing speed gate manages and channels the flow of people entering and moving around buildings. It employs sensors that detect visitors approaching, with pulsing light strips to guide the user. A sleep function saves on energy use. It can be customised with dimensional and glass choices, including corporate identity colors or other options, so that it either blends-in or stands-out from its surroundings. The Boon Edam Winglock Swing is constructed from stainless steel and a single glass panel, and is unobtrusive in nature and design. The access gate easily manages bi-directional traffic, with LED lights that signal if the gate is in use or on standby. The access gate ties into a manned security desk located near the front doors. Employees gain access to the building through either the Lifeline turnstiles, or a Winglock Swing access gate, while building visitors can receive credentials at the security desk. King said, “We started the process looking at Boon Edam from a security and an aesthetic standpoint. We went through multiple product options but always had a Boon Edam product as the basis of the design. We have been happy with Boon Edam entrance solutions and we are planning to use them again for future projects.”
Sponsored
C2 Esplanade, NT

C2 Esplanade, NT

Rondo Building Services Pty Ltd

Rondo incorporated Steel Stud and Track, specifically 64mm track sections along with KEY-LOCK Suspended ceiling systems to perfect the final look of the complex.
Sponsored
Permeable Car & Trailer Park

Permeable Car & Trailer Park

Atlantis

Snapper Creek Car Park was developed as an environmentally friendly permeable car park. As such the Atlantis® Turf CellTM and Atlantis® Gravel CellTM systems were chosen, to provide gravel driveways and grass parking areas, thus preventing compaction of the soil and to protect the grass and to stabilize the gravel and provide a permeable car park.The parking areas were divided into car only parking and car & trailer parking.The area, consisting of natural sandy material, was excavated to a depth of 300mm, and a tensar grid was placed into the excavation and the excavated material placed back on top of the tensar grid and compacted.A layer of 100mm of gravel was then place on the areas where the Atlantis® Gravel CellTM modules were to be used and the Atlantis® Gravel cellTM modules positioned thereon and filled with gravel.The Atlantis® Turf CellTM modules were installed and filled with soil and then the area was grass seeded; no turf was used. The project was completed in mid 2014 and was at that stage semi grassed and in use.The project required 4,300sq. m of Atlantis® 52mm drainage cell, which are 480mm x 260mm x 52mm panels and have a rigid interlocking clipping system and are made from recycled polypropylene.In August 2017, the operators of the car park, which is still operating, were contacted and they stated that they were extremely happy with the condition of the car park, even though it has heavy traffic as there is a boat ramp there, and some areas have been flooded by Snapper Creek.The Atlantis® Turf CellTM & Atlantis® Gravel CellTM systems are specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration; andhave a long use life.
Sponsored
Span+ & EasyMech MR - Mixed Use Project, TAS

Span+ & EasyMech MR - Mixed Use Project, TAS

Con-form Group

This project is a great example where the client wanted to realise the instant savings of Con-form Group’s engineer certified, rafter mounted system, over costly traditional mounting systems.With a mixture of our EasyMech MR (purlin-mounted), and Span+ (rafter-mounted), HVAC platforms - the client was able to successfully mount all mechanical units across the roof of this mixed-use development in Tasmania.Spanning over 9 metres, this retrofitted Span+ (rafter-mounted), installation answered the clients brief in more ways than one.Rated to 2.5kPa and attached to Con-form Groups proprietary steel stub columns – this platform and it’s screens were retrofitted to the roof of this shopping centre within 2 days.Paired with our Louvre airflow and Classic Screen Walls.
Sponsored
Ferrari World, Abu Dhabi

Ferrari World, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo supplied the Drywall Framing System in the construction of Ferrari World in Abu Dhabi, which is the world’s largest indoor theme park ­– including wall heights that ranged from 9 meters and above.
Sponsored
Midland Health Campus, WA

Midland Health Campus, WA

Rondo Building Services Pty Ltd

In excess of 125,000 Lineal Meters of Rondo product will be used in this multimillion dollar project: special custom lengths of Steel Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and Rondo MAXIjamb (jamb stud).
Sponsored
Salalah International Airport, Oman

Salalah International Airport, Oman

Rondo Building Services Pty Ltd

Rondo has supplied our Drywall Framing System in the new expansion package of the Muscat International Airport. The Muscat International Airport, which is the largest airport in the Sultanate, is being expanded simultaneously to meet the growing passenger traffic.
Sponsored
Icnssc, QLD

Icnssc, QLD

Rondo Building Services Pty Ltd

Rondo worked closely with Wadsworth Contracting providing KEY-LOCK Concealed Ceiling Systems, Panther Access Panels, plastering beads as well as external 92mm framing, soffit framing, internal 76 & 64mm wall framing.
Sponsored
Ferrero Rocher

Ferrero Rocher

Boon Edam Australia Pty Ltd

Ferrero’s new global HQ gathers in one building with nearly 1,300 people, previously spread over five different offices. The building, with a total floor space of almost 30,000 m², opened in December 2019. The building is designed to evoke the atmosphere of an Italian square: a vast atrium is surrounded by two multi-storey office wings. Boon Edam was appointed to craft and install the golden revolving door, on behalf of facade builder Groven + Portal, who in turn worked for general contractor Felix Giorgetti. The colour of the revolving door makes a visual reference to the world-famous golden chocolate - Ferrero Rocher. The Casa Ferrero administrative building consists of two blocks built on a common basement. It was the combination of these plots, and the architectural skills, that resulted in what you see today: a building that is both impressive and elegant as well as being a pleasant and functional workplace for the employees of the food group. Ferrero’s colours are subtly incorporated into the classic facades, with bronze tones and a gilded effect over the windows as well as the entrance glass panels. This effect was achieved by applying a gold-coloured textile fabric to the laminated glass during the project’s construction. Behind the glass facade of the entrance, the most jaw-dropping area of Ferrero’s headquarters unfolds - a central atrium that connects the two blocks and is entirely covered by a glass roof. The spacious atrium is designed to function as a reception and meeting space. Horizontal circulation between the two blocks is facilitated by connecting walkways with a range of 20 meters. The vertical circulation occurs through panoramic glass elevators. The central atrium’s glass-roofed space is open to life within the company and encourages interaction between employees. This 11-storey building, including six upper levels (ground floor + 5 floors) and five lower levels, adapts perfectly to its urban surroundings. The office areas are spread over nine floors, taking advantage of maximum light for the interior space. Levels -3 to -5 include technical areas and parking spaces. Ferrero’s wish was for a functional and pleasant building for everyone who works there. We think they have achieved this in spades!
Sponsored
Commercial Office - 32-41 West Street, Reading

Commercial Office - 32-41 West Street, Reading

Boon Edam Australia Pty Ltd

Reading is a vibrant city that boasts home to some of the largest company UK headquarters such as Microsoft and Pepsico calling this Berkshire county home to their UK head offices. Now, looking to transform the way they work, the retail HQ based in Reading upgraded its large office space to start a new era of work life for its current and future employees. This large refurbishment will see all floors of their existing building being completely reconfigured and re-designed that sees a new cafe/bar and staff gym/studio along with a studio mock shop space and office expansion. Within this project, the interior and exterior were dramatically changed and enhanced utilising fresh entry and security solutions. Contact us to see what we can do for your building. Originally and still currently known in Ireland as Penny’s, these UK headquarters resides in the centre of vibrant Reading. Launching its first clothing store back in 1969, the affordable yet innovative fashion retailer offers shoppers a unique shopping experience with its staple large stores, airy layouts and competitive item pricing. Calling it a ‘workplace of the future’ the new UK HQ spans over 130,000sq ft of redesigned space that homes 580+ employees. The challenge in this project was to unobtrusively implement secured entry solutions that could be stylish in appearance but also provide high-quality functionality. Social Open Space with State-of-the-Art Security With the overall theme being togetherness, collaboration and open workspace, there was a requirement for the building to be secured yet keep the spacious feeling. The challenge in this project was to unobtrusively implement secured entry solutions that could be stylish in appearance but also provide high-quality functionality. The entry solution was to implement a bespoke revolving door, combining a Crystal Tourniket and a framed Tourniket. This customised door benefits from a hidden fully automatic drive in the ceiling that also provides LED down lighting for better user visibility. For security, a bank of tall glass Lifeline Speedlane Swings with a wide-lane setup was specified. Contact us to see what we can do for your building.
Sponsored
Rouse Gardens

Rouse Gardens

Tremco

About the ProjectIn response to unprecedented demand, Rouse Garden is filling the void of modern-day homes close to trains, shops & jobs at the most competitive price on the market. Featuring the diversity of 1, 2 & 3 bedroom homes, there’s something for everyone in the most wondrous apartments to grace Rouse Hill. From floor to ceiling glass walls, timber hardwood flooring in your living room and a private rooftop garden terrace complete with BBQ and lounge areas. The quality of design is worthy of being marvelled at. Living rooms have been purposed to allow seamless indoor and outdoor transitions, blurring the boundaries between inside and out and elevating your home to new heights.ChallengeWhen you are building in one of the premier locations in Norwest Sydney, it’s all about the ding to match the lifestyle your new residents demand from your new community.  Presented with tight detail, the look, the feel and the performance of your build time-lines, and expectations of high quality, Hydraseal were tasked with working on Rouse Gardens. Waterproofing both the internals and roof of the building, the builder demanded warranties to match the project requirements and to deliver a quality finish demanded of this high profile project.To streamline this project, availability of stock and ease of application were key product requirements needed from the project, which Tremco were tasked with delivering.Tremco SolutionVulkem H2 Plus, Vulkem NEM, Tremflex50, Vulkem 951Hydraseal partnered with Tremco for a few reasons, primarily trust built up through a longstanding relationship provided the support necessary for the key for the success in this project.The versatility of Vulkem NEM being able to be used for internal wet areas, in conjunction with Vulkem H2, as well as for outdoor areas under Vulkem 951 NF allowed for fast and consistent application of waterproofing on the project, given the tight time frames, all backed with long warranties to match product performance.The combination of Vulkem NEM, Vulkem 951 NF and Vulkem H2 provided the warranties demanded by the builder which resulted in both Builder, and Applicator very satisfied with the job. 
Sponsored
Kuala Lumpur International Airport, Malaysia

Kuala Lumpur International Airport, Malaysia

Rondo Building Services Pty Ltd

Rondo has supplied our Key-Lock Suspended Concealed Ceiling System to the new KLIA2 terminal. The KLIA2 is built to be Malaysia's Next Generation Hub - an airport hub that will allow seamless connectivity between low-cost and full-service carriers.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Functional Coatings - Crystalbrook Kingsley

Functional Coatings - Crystalbrook Kingsley

ECOTONE

CollaborationArchitect: EJE ArchitectureBuilder: Core Project GroupBreifDevelop the best coating system to maintain the surface appearance of the newly restored heritage-listed Kingsley building to align with its vision of being a true luxury hotel.Material & ApplicationECOCLEAN Porosity CoatingECOCLEAN Self-Cleaning CoatingOutcomeThe ECOCLEAN coating system uses self-cleaning technology to preserve the concrete appearance of the Kingsley – the first luxury hotel in Newcastle. Winner of two Asia-Pacific Hotel of the Year awards, the Kingsley is a remarkable example of what photocatalyst coatings can do to preserve the appearance of heritage-listed buildings while reducing maintenance budgets.TestimonialAn old soul with a fresh twist, Crystalbrook Kingsley is culturally connected, sustainably-led, simply sophisticated, and steeped in history. The first luxury hotel to grace Newcastle, Crystalbrook Kingsley sparks vibrant energy and nostalgia in one moment.
Sponsored
North Byron Beach Resort, NSW

North Byron Beach Resort, NSW

Rondo Building Services Pty Ltd

Rondo put their Key-Lock Ceiling System to the test with the fascias and soffits, being curved in both directions. To create the exact shape and flow desired by the architect, precise installation was crucial and was achieved through a successful partnership between Rondo and Brunswick Valley Plastering.
Sponsored
Commonwealth Law Courts, NT

Commonwealth Law Courts, NT

Rondo Building Services Pty Ltd

Rondo assisted Brett Watson Contracting in providing the featured elliptic curved detail that made the eye catching internal ceiling layout possible. Rondo supplied our KEY-LOCK Concealed Ceiling System to create the coffered ceiling treatments in the main atrium.
Sponsored
105 Mitchell St, NT

105 Mitchell St, NT

Rondo Building Services Pty Ltd

Rondo has played a major role in the nearly 5,000m2 ‘105 on Mitchell Street’ hotel redevelopment. Rondo has so far provided about 8,000m2 of KEY-LOCK Concealed Suspended Ceiling System and 76mm Steel Stud Drywall Framing to this project.
Sponsored
ADNOC Head Quarters, Abu Dhabi

ADNOC Head Quarters, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo is proud to be a supplier to ADNOC's new headquarters complex, which will be both a landmark building for the company as well as for the United Arab Emirates. Rondo have supplied the drywall framing as well as a wall cladding system using Rondo Furring Channel and fixing clips.
Sponsored
Quest Apartments, WA

Quest Apartments, WA

Rondo Building Services Pty Ltd

The project was subject to wind loading up to 2.8kPa ultimate and 1.9kPa serviceability. Our technical designs specified wall and ceiling systems, as well as complementary accessories to be supplied to the project. Being able to provide tailored designs within a tight deadline was crucial to the project.
Sponsored
Taranaki Base Hospital, NZ

Taranaki Base Hospital, NZ

Rondo Building Services Pty Ltd

Rondo’s 92mm Steel Stud and Track system was selected for all internal works as it best meets all the requirements implemented by Warren and Mahoney, lead architects for this project. Factors such as spans, acoustics, loads, future proofing and supply were all considered during the initial design period.
Sponsored
Accor Vacation Club Apartments, Twin Waters, Sunshine Coast, QLD

Accor Vacation Club Apartments, Twin Waters, Sunshine Coast, QLD

Caroma

As part of the ‘green’ refurbishment of the Accor Vacation Club Apartments, GWA Bathrooms & Kitchens supplied highly-efficient fittings and fixtures to complement the greater environmental awareness of the new design. Improved water conservation was achieved by installing the latest in efficient flush systems and reduced flow tapware in all the bathrooms and kitchens.
Sponsored
Adelaide Botanic High School, SA

Adelaide Botanic High School, SA

Rondo Building Services Pty Ltd

The initial project had been executed in August 2017. Customising the building with KEY-LOCK Suspended Ceiling System, particularly Rondo 155 Furring Chanel which is 48mm wide, and required perforated plasterboard to be attached. Bulkheads, soffit areas and external walls were designed by the Rondo Engineering team.
Sponsored
Calvary Hospital, SA

Calvary Hospital, SA

Rondo Building Services Pty Ltd

John Holland recently built the largest private Hospital in South Australia, adding to its already suburb health care facilities. Rondo worked alongside Contractor Brighton Australia and Architect STH Architects, to deliver this state-of-the-art facility. Rondo supported the $400m build with a range of products and systems.
Sponsored
Baldivis High School, WA

Baldivis High School, WA

Rondo Building Services Pty Ltd

Rondo provided technical design specifications when it came to the development and execution of an SAW Tooth ceiling which is featured in the main areas of the school building. BSHS will feature Rondo’s popular KEY-LOCK Suspended Ceiling System, Steel Stud and Track and EXANGLE products throughout the internal building frame.
Sponsored
100 Creek Street, QLD

100 Creek Street, QLD

Rondo Building Services Pty Ltd

The Rondo team were engaged in the project to design the ceiling framework for the lobby of the twenty-five-storey building. The Rondo KEY-LOCK suspended ceiling system with radius top cross rail was specified to create the proposed arch ceiling, along with Steel Stud and Track for the walls in other areas of the project.

Showing 217-249 of 249

Feedback