NBS Source
I'm a manufacturer

"access control systems"

1,732 results found

Sort by:

Showing 217-252 of 297

Sponsored
Colour by Design - The Lennox

Colour by Design - The Lennox

ECOTONE

CollaborationArchitect: JPW and Marchese PartnersBuilder: EQ ConstructionsDeveloper: Aoyuan InternationalMaterial & ApplicationWe applied our specified ECOTONE Minsil to precast concrete elements onsite using swing stage access.OutcomeThe Lennox stands proudly on the riverside at the junction of the historic Lennox bridge and Church Street Parramatta. Our colour finishes work perfectly with the building and surrounds. The Lennox has gone on to win ‘Best International Project’ at the PCBC Gold Nugget Awards in San Francisco.
Sponsored
Altona Dog Beach Showers, VIC

Altona Dog Beach Showers, VIC

BRITEX Metal Products

Commissioned by Hobson Bay City Council as part of the PA Burns Reserve and Altona Dog Beach Upgrade, Britex supplied a set of purpose built, custom designed Vandal Resistant Stainless Steel Dog Showers. Accessible Drinking Fountains with additional Dog Bowl were also supplied. The Customised Britex Dog Shower supplied included: 4 x Vandal Resistant Stainless Steel Square Dog Showers Manufactured from Marine Grade Stainless Steel Various heights supplied, 800mm and 1200mm options Integrated Lead Connectors • Vandal Resistant Time Flow Tapware Multiple Shower Sets installed at different heights for small and big dogs Integrated Safety Grab Rails
Sponsored
Bike Lockers for St. Leonards Square

Bike Lockers for St. Leonards Square

Cora Bike Rack

As one of Mirvac’s signature developments, St. Leonards Square exemplifies sophisticated living in Sydney - including the exceptional amenities residents have come to expect. As part of this project, Cora Bike Rack was consulted to ensure the industry’s best bicycle facilities would be provided to future residents. The CBL bicycle locker range includes heavy duty models for use in outdoor public areas, and cost efficient light duty models for use in secure indoor areas such as residential and commercial towers.
Sponsored
Liberty Global

Liberty Global

Boon Edam Australia Pty Ltd

Hospitality and security are often at odds with each other. The challenge is to find the best compromise between Fort Knox and a warm welcome. Telecom company Liberty Global recently carried out a major renovation of their head office in Schiphol-Rijk – the Netherlands. As part of the project, the access security was considerably tightened, without affecting their brand’s desired welcoming appearance. Liberty Global is an international telecommunication and television company. It is also one of the largest internet service providers outside the USA. Liberty Global operates in 14 countries and has 35,000 employees. The head office is based in London and additionally there are central offices in Amsterdam and Denver. Consumer brands that belong to Liberty Global include VodafoneZiggo (50% Joint Venture with Vodafone), Virgin Media, UPC, Unitymedia and Telenet. In the high-quality business park - Schiphol-Rijk, Liberty Global have seven office buildings, which, collectively, employ a total of around 1600 people of 55 nationalities. "We did have manned security at the main entrance, but that solution did not always prevent people from entering our central hall unnoticed," says Simon Kuitert, who holds the position of Corporate Security Manager at Liberty Global. "That is why we introduced a single point of entry for the recent renovation."
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
EasyMech MR (purlin mount platform): Mixed-use Project, NSW

EasyMech MR (purlin mount platform): Mixed-use Project, NSW

Con-form Group

his project saw a number of our systems installed including six of our EasyMech MR platforms in varying sizes, ScreentoRoof MR system, ClassicScreen Walls and our Acoustic+ screen wall system.We consulted with the team from design to install to ensure a smooth and seamless experience.For more information on our systems, contact our Customer Care Team today.
Sponsored
Bike Parking for Perth Children's Hospital Project

Bike Parking for Perth Children's Hospital Project

Cora Bike Rack

When the John Holland group needed assistance with designing an End of Trip Facility (EOT) for the new Perth Children’s Hospital project, they turned to Cora Bike Rack for advice. With several challenging spatial elements and the requirement to provide AS2890.3 compliant bike racks and layout, Cora assisted in the bike rack selection which included both horizontal and vertical racks. The most efficient use of space in this project was achieved by including E3VR vertical racks mounted to E3VR-P double sided mounting posts.
Sponsored
Skycity Casino & Hotel, SA

Skycity Casino & Hotel, SA

Rondo Building Services Pty Ltd

The KEYLOCK Concealed Suspended Ceiling System, Steel Stud and Track Wall Framing System, and XPRESS Drywall Grid Ceiling System have been integrated throughout the project. Rondo’s long-term relationship with Ceiling & Wall Contractors enables the project to run smoothly and the onsite coordination is exemplary.
Sponsored
Old Treasury Building, WA

Old Treasury Building, WA

Rondo Building Services Pty Ltd

The entire building also featured ceilings acoustically isolated from the old structure where heavy duty isolators were required to be incorporated into the Rondo KEY-LOCK Concealed Suspension System. Similarly Rondo had to design a supplementary suspension system beneath these ceilings to accept a secondary system to support some services and particularly architectural feature ceiling beneath.
Sponsored
Royal Hobart Hospital, TAS

Royal Hobart Hospital, TAS

Rondo Building Services Pty Ltd

As the project was located in Hobart, it required the project team including Rondo to work together to be organised and keep a clear path of communication. This resulted in the full specification being completed early in the process, the specification included Rondo Wall Stud, KEY LOCK Ceiling Systems, DUO Ceiling Systems, External Soffit Systems and our extensive knowledge on seismic design.
Sponsored
Parramatta Square, NSW

Parramatta Square, NSW

Rondo Building Services Pty Ltd

Rondo provided a range of market leading wall and ceiling systems for both buildings 3 and 4. Our KEYLOCK Concealed Suspended Ceiling System and Steel Stud and Track Wall Framing System were used for the internal fit out, completed by AUSTRAL Interiors. SMTM Projects used our 1.15 BMT Stud and Track with top hats.
Sponsored
Victoria Gardens Shopping Centre, VIC

Victoria Gardens Shopping Centre, VIC

Sculptform

The refurbishment of the Victoria Gardens shopping centre designed by Colab Design Studio uses Sculpform's Aluminium Click-on Batten system to create a stunning curved Oculus, along with feature walls and ceilings throughout the centre. Sculptform’s Click-on batten system provided a unique solution that could be customised to address the incredibly complex geometry of the existing architecture. Being able to use the same system for the mall cladding, mall ceiling installations and the oculus cladding ensured absolute consistency across the entire centre.
Sponsored
Silkstone State School Parking Bays

Silkstone State School Parking Bays

Atlantis

APPLICATION: 52mm Drainage Cell.PROJECT LOCATION: Silkstone Qld.PROJECT DETAILS: Parking Bays at the Silkstone Primary School.PROJECT COMPLETION: Sep 2013.Atlantis system saves big old tree.At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But, in the proposed car park was a huge old tree. The tree could be cut down and the roots dug out or the tree couldbe left, with open soil above the root system to allow for infiltration to keep the tree healthy; but this would lose atleast six car spaces. What was to be done?The answer turned out to be simple – keep the tree, but surround the tree with Atlantis® Gravel Cell™ 52mm cells.Hence while the rest of the car park was sealed, the areaaround the tree was prepared and the 52mm cells werelaid and clipped together there and filled with 10mmgravel. This area was of sufficient size to provide 3 carplaces on each side of the tree and a driveway in frontof the tree, while at the same time allowing rainfall toinfiltrate through the gravel into the root system.Thus we had a win-win situation. Not only was the treesaved, and money saved on not having to remove it, butthe root system of the tree was protected by the GravelCell™ system, and six extra car spaces were created.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
ANZAC Memorial

ANZAC Memorial

Tremco

About the ProjectThe ANZAC Memorial was designed as a sculptural monument, a unique collaboration between Architect Charles Bruce Dellit and sculptor George Rayner Hoff; it is arguably one of the finest examples of the union of architecture and art in Australia.The building is a striking architectural form, symmetrical on both axes. It uses elements reminiscent of traditional Gothic architecture (buttresses, cathedral windows, high ceilings) in the Art Deco style. The Memorial is adorned externally with twenty sculptures representing the units of the Australian Imperial Force (AIF). These are the sentinels of the building, keeping watch while representing the fallen to whom the building is dedicated.Bruce Dellit’s vision for the Memorial included a still pool bounded by poplars to the north of the building (included for their significant symbolic association with the battles in France and Belgium), and a cascading fountain to the south.The Hall of Service, at the centre of the Centenary Extension, is a civic space that architecturally and artistically mirrors the Hall of Silence. The Hall was named in acknowledgment of the original Memorial halls and to recognise more than a century of service by Australian servicemen and servicewomen. At the threshold to the space are the words: “NSW Service with and for All Australians”.The ChallengeWhen restoring a National War Monument visited by hundreds of thousands of people, you need to provide the highest quality results and finishes expected of such a significant structure in our history. The challenge here, comes from creating a restoration solution on a building which was designed in the early 1930’s, which will be flexible enough to maintain the architects core design features but also created and executed within a tight time frame in time for ANZAC day. The solution needed to encompass modern technology with traditional design features to ensure the restoration lasts for the next 100 years as a memorial to our fallen heroes.Tremco SolutionTremco worked closely with Sure Seal and Built to provide a solution which was both timely and high quality. the installers long standing relationship with Tremco, a number of unique solutions, together with a 20 year warranty period proved a success.Over 15,000m2 of Tremco products were installed on this historic site. Tremco provided regular iAudit reports on the job site (iAudits is a quality control measure used to ensure the products are being applied consistently to maintain warranty conditions) During regular site visits, Tremco were able to provide a high level of customised Technical information and design advice to ensure the project ran smoothly and to Built’s expectations.
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
The Podiums, QLD

The Podiums, QLD

Rondo Building Services Pty Ltd

For instance, Superior faced the challenge of creating curved detailed bulkheads and feature ceilings. However, with Rondo’s help using a hybrid of the Rondo KEY-LOCK Concealed Ceiling System and Stud & Track Wall Framing System, they managed to create a great outcome.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Moonee Ponds, VIC

Moonee Ponds, VIC

Rondo Building Services Pty Ltd

Rondo Technical Representative Tino Cucinotta, worked closely with the 2DG team – and assisted with the supply of QUIET STUD Acoustic Wall System, Stud & Track and Finishing Sections, whilst Rondo’s newly released XPRESS Drywall Grid Ceiling System was due to arrive, ensuring the project could continue efficiently.
Sponsored
Al Zeina - Al Raha Beach, Abu Dhabi

Al Zeina - Al Raha Beach, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo has supplied the external framing system for EIFS façade system in the Al Zeina development. Al Zeina is the strategic gateway to the new Al Raha Beach Development where the natural beauty of Abu Dhabi is captured by the creation of a collection of formal Arabic gardens, courts and plazas in the tradition of gardens of the world.
Sponsored
Peppers Pier Resort, QLD

Peppers Pier Resort, QLD

Rondo Building Services Pty Ltd

The Rondo Technical Services Department worked closely with CSR Gyprock to come up with a suitable External Wall system. The project consists of over 30,000 lineal metres of 92 1.15bmt lipped studs used for the external wall system and over 45,000 lineal metres of 64mm 0.50bmt lipped studs for the internal walls.
Sponsored
Kilmore Street Medical Centre, NZ

Kilmore Street Medical Centre, NZ

Rondo Building Services Pty Ltd

Rondo worked with Forman Commercial Interiors and Alpha Holdings on the three storey, $40 million project by providing all of the Steel Stud and Track requirements along with the KEY-LOCK Concealed Suspended Ceiling System. Due to the various wall systems designed, Rondo supplied diagrammatic specifications for the junction details to assist in completing the project, which finished in August this year.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing Rondo 92mm Stud & Track Systems, KEY-LOCK Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing 92mm Stud & Track Systems, Key-Lock Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Wynn Place, Macau

Wynn Place, Macau

Rondo Building Services Pty Ltd

The hotel and casino will include a luxury hotel, gaming areas, dining, and retail and convention facilities along with numerous special attractions. Rondo provided this project with all the Drywall Steel Stud Partition Systems for the podium, gaming areas and the hotel tower. Included in the plan were also specially designed and supplied maintenance WALK–ABOUT Trafficable Ceiling Systems as per the project requirements.
Sponsored
Adelaide Medical Nursing School (AMNS), SA

Adelaide Medical Nursing School (AMNS), SA

Rondo Building Services Pty Ltd

Rondo’s Seismic products within each system included DUO Perimeter Trim Sliding Clip (Rondo 850), KEY-LOCK TCR Seismic Joiner (Rondo 865) and Seismic plenum braces. With the KEY-LOCK Seismic Concealed Ceiling System, two-side fixed, free wall perimeter connections and Rondo 141 Wall Track (1.15BMT to suit 129 Furring Channel) was used.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Park Hyatt, NZ

Park Hyatt, NZ

Rondo Building Services Pty Ltd

Due to tight plenum space and extremely congested plenum areas, Rondo’s new Xpress Drywall Grid System was the ideal ceiling system to use. This maximised the ceiling heights in all guest rooms while offering compliant plenum vertical clearances. Contractors implemented Rondo’s intricate feature ceilings and bulkheads throughout the entire building, such areas included the lobby, restaurants and conference areas.
Sponsored
Fiona Stanley Hospital, WA

Fiona Stanley Hospital, WA

Rondo Building Services Pty Ltd

Rondo has supplied 80,000l/m of DUO Exposed Grid Ceiling System and 148,000 L/M of Steel Stud Drywall Framing System to three of the main buildings. As the design required a variety of special length products, Rondo has been producing large quantities of these items in advance and storing them at the Rondo warehouse in WA to enable quick supply and install for contractors on site, which ensures the project can progress at a rapid rate.
Sponsored
Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Hempel

With a glass façade symbolising the transparency of justice and a glossy metal exoskeleton, the new Maison de l’Ordre des Avocats (House of the Paris Bar Association) is a stunning addition to the French capital’s new Batignolles judicial city. For the building owner, safety is a top priority. Therefore, the exoskeleton needed a proven passive fire protection coating that would enable the steel to maintain its load-bearing capacity for up to 60 minutes during a fire, giving those inside valuable extra time to evacuate.The challenge Specialist paint application and surface treatment company ROTH & Cie was contracted to apply the passive fire protection coating system. ROTH & Cie has worked with Hempel for many years and was keen to work with us on this project. However, due to the project schedule, the tubular exoskeleton framework was delivered to the construction site with a competitor’s epoxy primer already applied. ROTH & Cie therefore wanted a Hempel passive fire protection system that would work with the existing primer. Also, as building aesthetics are important in the overall design, the exoskeleton needed a high-quality matt satin finish. The solution Our solution was to specify a system of Hempafire Pro 315 and Hempathane 55750. A single component intumescent coating, Hempafire Pro 315 complies with the EN 13501-2 standard for the fire classification of construction products. It is optimised to provide 60 minutes of passive fire protection, as well as partial protection up to 90 minutes. In addition, thanks to its exceptionally low loadings, Hempafire Pro 315 requires significantly lower dry film thicknesses than competitor products. As a result, ROTH & Cie could apply the coating in a thinner coat, significantly reducing paint consumption, application time and project costs. The full system was completed with Hempathane 55750, a polyurethane topcoat with quick crosslinking properties that provides the matt satin appearance required by the specifications. Our dedicated passive fire protection R&D Centre in Barcelona, Spain verified that Hempafire Pro 315 could be applied on top of the existing primer. The entire system was spray applied using an electric airless pump, which is ideal for construction sites as it does not require an air compressor. The project is just another in a long line of successful collaborations with ROTH & Cie, which also include previous passive fire protection coating projects, most notably La Halle Secrétan covered market and La Samaritaine department store, both in Paris.At a glance Project Name: Maison de l’Ordre des Avocats (House of the Paris Bar Association) Customer: ROTH & Cie System: Hempafire Pro 315 + Hempathane 55750 Volume: 4,080 litres
Sponsored
No.1 Collins Wharf, VIC

No.1 Collins Wharf, VIC

Rondo Building Services Pty Ltd

No 1. Collins Wharf is the latest part of the $1.2 billion development of the Victoria Harbour precinct. The 29-level apartment complex, built by Lend Lease and designed by Architectural firm, Bates Smart was completed in September this year and boasts 321 water-lined apartments and townhouses. Expoconti were awarded the wall and ceiling contract for the $106M development and soon after contacted Rondo to supply systems for the external walls, external cladding and internal suspended ceiling system.
Sponsored
Blue Cross Age Care, VIC

Blue Cross Age Care, VIC

Rondo Building Services Pty Ltd

MP Group were charged with managing the installation and finishing of all internal and external walls and this is also where Rondo offered our support. With the external structural steel framing having been installed 150mm out of position, Rondo’s Technical Services Team came to the rescue and designed an external stud wall system using our MAXIframe External Wall Framing System to ‘fill the gap,’ including design of special header bracing details to support the wall.
Sponsored
Multi-level Apartments with Enclosed Balcony, NSW

Multi-level Apartments with Enclosed Balcony, NSW

Breezway Australia Pty Ltd

Designed by Tony Owen Partners, Breezway Altair Louvre Windows were recommended to the Developer by the Architects at Tony Owen Partners due to their visually appealing aesthetics, the products full certification and compliance with Australian Standards, and Breezway’s strong reputation in the window industry. Altair Louvres with the Stronghold System have been strategically placed on the corner of the building as a key visual feature. Being a high quality window system, Altair Louvres will provide protection from the elements and are restricted to comply with Fall Prevention requirements.
Sponsored
Sir Edward Weary Dunlop Retirement Village, VIC

Sir Edward Weary Dunlop Retirement Village, VIC

Rondo Building Services Pty Ltd

The Sir Edward Weary Dunlop Retirement Village has been completed with the help of architect, builder and contractor Ryman Healthcare. The 134-unit age care facility will house serviced care units and independent living units for the elderly with resort-style facilities. Rondo assisted in the development of this project, supplying a number of products including Stud and Track (64mm and 92mm x 0.55BMT), KEY-LOCK Suspended Ceiling Systems and MAXIjamb Systems for the large window and door openings leading onto balconies.
Sponsored
Ready to Set Sail at the Brisbane International Cruise Terminal

Ready to Set Sail at the Brisbane International Cruise Terminal

Flowcrete

The brand new state-of-the-art $177 million Brisbane International Cruise Terminal was completed in mid-2020 and will serve as a gateway for the Queensland tourismsector. The 9,300m² terminal was designed by Arkhefield in collaboration with Arup will provide visitors with a world class experience.The public spaces including the internal walkways, communal areas and departure lounge featured 1,500m² of Flowcoat Terrosso in four bespoke colour combinations.The decorative resin-based flooring system was chosen to provide a decorative, seamless flooring system that would not only create a luxurious and welcome environment, but withstand the expected foot traffic.A further 1,200m² of Deckshield ID was applied to the foot bridge, providing passengers with a slip resistant and safe surface as they board or disembark some of the biggest cruise ships in the world.Tremco CPG Australia’s portfolio of industry leading products provided not just a flooring solution for the world-glass tourism facility. In addition to the Flowcreteflooring systems, Tremco CPG Australia also provided the structural glazing silicone Proglaze II to a total of 218 glass panels.
Sponsored
Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Hempel

At the new 6,000-seater Jordal Amfi ice hockey stadium in Oslo, Norway, player and spectator safety is a top priority. The stadium owner wanted a coating system which included passive fire protection, so, when Danish-based Give Steel was contracted to produce the steel structures, they had to not only meet the customer specification for fire protection but also consider the logistics of the project.The steel pieces were produced in Denmark, and Give Steel needed a coating system that was robust enough to protect the steel during transportation and erection onsite.

Showing 217-252 of 297

Feedback