NBS Source
I'm a manufacturer

"minor buildings garages etc"

465 results found

Sort by:

Showing 145-159 of 159

Sponsored
Cairns Performing Arts Centre, QLD

Cairns Performing Arts Centre, QLD

Rondo Building Services Pty Ltd

Rondo assisted contractor, Interline, under Builder FKG Group. A large part of the support meant assisting with technical designs that were sympathetic to the cyclonic region that is Cairns.
Sponsored
Midland Gate Shopping Centre, WA

Midland Gate Shopping Centre, WA

Rondo Building Services Pty Ltd

Ceiling and Walls Contractors have been a loyal customer to Rondo for almost 20 years. Ceiling and Walls Contractors are highly experienced with Rondo products. Our Rondo Technical Representative was readily available to visit site and provide technical assistance.
Sponsored
Ovo Green Square - Bike Parking for an Iconic Building

Ovo Green Square - Bike Parking for an Iconic Building

Cora Bike Rack

When deciding on bicycle parking solutions for the Ovo project, Cora Bike Rack presented its range of innovative product designs that could tailored for this special project. In order to provide maximum capacity and accessibility, Cora’s E3DT-GT double tier system, E3VR vertical wall mount system and CBR bike parking rails were combined to offer the ultimate AS2890.3 compliant EOT facility.
Sponsored
Mosman Park Shopping Centre, WA

Mosman Park Shopping Centre, WA

Rondo Building Services Pty Ltd

Rondo provided Red Oak Contracts Pty Ltd with the external wall, soffit and bulkhead designs which were submitted to BADGE and Hames Sharley Architects for approval. Rondo’s technical team highlight the quality of workmanship on this project, especially when comparing the designs to the finished installation. The stock was supplied on time and accurate with Rondo working with all parties throughout this project which is a credit to all involved.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
Adelaide Medical Nursing School (AMNS), SA

Adelaide Medical Nursing School (AMNS), SA

Rondo Building Services Pty Ltd

Rondo’s Seismic products within each system included DUO Perimeter Trim Sliding Clip (Rondo 850), KEY-LOCK TCR Seismic Joiner (Rondo 865) and Seismic plenum braces. With the KEY-LOCK Seismic Concealed Ceiling System, two-side fixed, free wall perimeter connections and Rondo 141 Wall Track (1.15BMT to suit 129 Furring Channel) was used.
Sponsored
NZ Hillary Field Centre Upgrade, Antarctica

NZ Hillary Field Centre Upgrade, Antarctica

Rondo Building Services Pty Ltd

Builder: Leighs Construction Contractor: Leighs Construction Location: Ross Island, Antarctica Project Value: $6.2 Million
Sponsored
Dubai International Airport - Concourse 4, Dubai

Dubai International Airport - Concourse 4, Dubai

Rondo Building Services Pty Ltd

Rondo Steel Stud Drywall Framing System will be used in the construction of the Dubai International Airport - Concourse 4 project.
Sponsored
New Royal Adelaide Hospital (newRAH), SA

New Royal Adelaide Hospital (newRAH), SA

Rondo Building Services Pty Ltd

The new Royal Adelaide Hospital (newRAH) is a significant project for Rondo, with our Engineering team providing extensive design support and developing innovative system solutions for over two and a half years prior to the commencement of construction. Now with construction underway, Rondo has continued to play a major role, supporting site contractor, Brighton Australia, with the design and manufacture of products that meet the projects’ ‘Category 4’ design requirements, which includes specifications for Seismic designs.
Sponsored
Sir Edward Weary Dunlop Retirement Village, VIC

Sir Edward Weary Dunlop Retirement Village, VIC

Rondo Building Services Pty Ltd

The Sir Edward Weary Dunlop Retirement Village has been completed with the help of architect, builder and contractor Ryman Healthcare. The 134-unit age care facility will house serviced care units and independent living units for the elderly with resort-style facilities. Rondo assisted in the development of this project, supplying a number of products including Stud and Track (64mm and 92mm x 0.55BMT), KEY-LOCK Suspended Ceiling Systems and MAXIjamb Systems for the large window and door openings leading onto balconies.
Sponsored
Al Zeina - Al Raha Beach, Abu Dhabi

Al Zeina - Al Raha Beach, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo has supplied the external framing system for EIFS façade system in the Al Zeina development. Al Zeina is the strategic gateway to the new Al Raha Beach Development where the natural beauty of Abu Dhabi is captured by the creation of a collection of formal Arabic gardens, courts and plazas in the tradition of gardens of the world.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
South Australian Health & Medical Research Institute (SAHMRI), SA

South Australian Health & Medical Research Institute (SAHMRI), SA

Rondo Building Services Pty Ltd

With a demand for leading scientific research facilities growing year upon year, the South Australian Government commissioned the development of the South Australian Health & Medical Research Institute (SAHMRI). Since the project commenced in 2010, Rondo has supplied our KEY-LOCK Suspended Ceiling System, Steel Stud and Track, DUO Exposed Grid Ceiling System, PANTHER Access Panels, Shaftwall and Walk-About Trafficable Ceiling System.
Sponsored
King Abdullah Petroleum Studies and Research Centre, Saudi Arabia

King Abdullah Petroleum Studies and Research Centre, Saudi Arabia

Rondo Building Services Pty Ltd

Builder: Aramco Contractor: DEPA, Drake and Scull Architect: Zaha Hadid Architects Location: Riyadh, Saudi Arabia Project Value: $2.5 million
Sponsored
Dallas Police Department, Dallas Texas, USA

Dallas Police Department, Dallas Texas, USA

Boon Edam Australia Pty Ltd

There is a saying that “Everything is Bigger in Texas,” and the Dallas, Texas police department is no exception. The city of Dallas is ranked in the top 10 cities in the U.S. in terms of population, at 1.2 million people. The Dallas Police Department is the ninth largest municipal police force in the U.S., based on 3,012 sworn officers. It is led by Chief of Police, U. Reneé Hall. Security a Concern When Designing HQ Building The department is located in the Jack Evans Police Headquarters building, which was built in 2003. It is 358,000 square feet, has six floors, is spread over a three-acre site, has a separate 1,200 car parking garage and a two-acre, open parking lot for additional visitor parking. Prior to 2003, the department was housed in the circa 1914 former City Hall Building. The Jack Evans Police Headquarters building was under construction when 9/11 terrorists flew airplanes into the World Trade Buildings in New York. That event was preceded by the Oklahoma City Murrah Federal Building bombing in April 1995. Therefore, security was a concern in its design. Police officials worked with a Police Design Consultant – McClaren, Wilson, and Lawrie Architects of Phoenix – to help design the building to resist a terrorist attack and isolate potential hazards. The building also needed to control visitor traffic and access. On an average month, there are 5,000 public visitors to the Jack Evans building. In addition, shots fired at police buildings nationally are not uncommon, says Paul M. Schuster, Senior Corporal/Facilities Management for the Dallas Police Department. “For the most part they are random, single shot drive-by shootings. Often, the officers are unaware that the building has been shot at, until they find a bullet hole in the brick or glass. Increasingly, police tend to be a symbol of government and some citizens see that as a visible target to lash out at. Police officers are trained to expect the routine types of calls, such as domestic violence, traffic accidents, and other crimes. Yet they must be flexible to anticipate the non-routine that can be dangerous and change in a heartbeat.” An Active Shooter Incident Led to an Increase in Security On June 13, 2015, after midnight, a 35-year-old male placed a duffle bag with a remote-controlled bomb to detonate later between cars in the parking lot of the headquarters building. The suspect then began shooting continuously at the lobby windows. Officers responded to the scene, a vehicle chase began, and the incident ended outside the city. Luckily officers in the lobby took cover and were not injured. Following that incident, the Dallas Police Department conducted a security assessment of the building and also at seven patrol stations throughout the city. The assessment included testing various construction materials for bullet resistance to various types of weapons. Gensler Architects and Guidepost Solutions, LLC developed the solutions and plans. “Yesterday we were concerned about handguns, today we are worried about rifles, and the idea of terrorism is always present with outright attack or bombs,” Schuster notes. “The police officers and police staff only want a place that is safe and where they can do their good work.” Funding of $1.3 million was approved to upgrade the lobbies of the seven patrol stations to withstand rifle rounds, and $1.9 million to improve headquarters lobby security, and to upgrade an aging security system. Turner Construction Company and Convergint Technologies, LLC conducted the renovations and security technology integration. Challenges to the Security Design The headquarter’s lobby was initially designed as a two-story glass-walled structure, with an information desk and public records service windows. Visitors were allowed free entry into the lobby and were only screened in an open area to the side if going to other floors. “The challenge in upgrading lobby security was the two-story lobby entrance glass. “In addition, there were concerns about keeping an ‘open’ and friendly service concept in mind and ensuring that the lobby would not resemble a ‘fortress’,” Schuster notes. Screening Room with Security Revolving Doors to Contain Incidents The solution was to keep the existing exterior unchanged and focus on adding a layer of security once a person enters the lobby. Visitors now enter the headquarters and immediately proceed to a side room where security screening is conducted. A new secondary wall with bullet-rated glass and solid bullet resistant wall materials was constructed inside the lobby to channel visitors to the room. Once inside the screening room, which also has bullet resistant walls, the visitor has belongings x-rayed, and they walk through a metal detector. In the event that anyone was to produce a gun and begin shooting, the incident could be contained inside that room. Once a visitor has been cleared, they proceed into the main lobby via a Boon Edam Tourlock 180 security revolving door. This automatic, four-wing door is the most advanced, security revolving door in the Boon Edam product range that offers maximum throughput, allowing users to enter and leave the building simultaneously. In the event that a large number of persons try to force their way into the facility, the Tourlock 180+90 will determine that more than one person is trying to enter and will reject the person and lock out any others from entering. Once a visitor is ready to leave the lobby and exit the building, they pass through another Boon Edam Tourlock 180+90 that leads to a vestibule with exterior swinging doors. In the event that someone tries to go back into the lobby from the front vestibule area, without going through the security screening room, the Tourlock security revolving door will reject their entry.

Showing 145-159 of 159

Feedback