NBS Source
I'm a manufacturer

"concrete reconstructed stone bricks"

614 results found

Sort by:

Showing 37-44 of 44

Sponsored
ANZAC Memorial, Hyde Park

ANZAC Memorial, Hyde Park

ECOCLEAN

COLLABORATIONArchitects: Johnson Pilton Walker (JPW) and the Government Architect’s Office.Builder: Built.BRIEFThe project required a coating that would preserve and protect the feature precast concrete ceiling, beams, walls, and eyelet as part of the Anzac Memorial Centenary Project.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEA stunningly sustainable multi-award-winning project that includes the prestigious Sulman Medal. Our team is so proud to have played a part in the preservation of one of Sydney’s most iconic monuments, a symbol of our history and our future.
Sponsored
Amazon Virginia Headquarters

Amazon Virginia Headquarters

CarbonCure

Amazon HQ2 is part of the Metropolitan Park site, an existingurban renewal and development project in National Landing.The first phase of our “ground-up” construction will see theredevelopment of a block of vacant warehouses into two newLEED Platinum-certified buildings, new retail space for areabusinesses, and plenty of open space for the community toenjoy. These buildings are the first step to creating an urbancampus where Amazon’s future 25,000 employees and thelocal community can live, work and play.Miller & Long delivered an estimated 106,555 cubic yards(81,467 cubic metres) of concrete made with CarbonCure, whichwill save approximately 2,522,000 pounds (1,144 tonnes) of CO2.
Sponsored
Colour by Design - The Harrington Collection

Colour by Design - The Harrington Collection

ECOTONE

Collaboration Architect: Fjmt StudioBuilder: Icon CoPrecaster: Advance PrecastDeveloper: Golden Age Group and HannasMaterial & ApplicationECOTONE Minsil applied in Cold Light as specified by the architect to the external precast concrete elements.OutcomeThe Harrington Collection design was inspired by the history of The Rocks and Sydney’s splendid harbour. ECOTONE was able to work closely and in collaboration with our clients to produce a truly special Colour by Design for this project.TestimonyWe are excited to bring such a rare opportunity to such an iconic location, and have ensured every detail is carefully considered to reflect our commitment. These residences are designed to be the perfect blend of modernity and heritage to celebrate the complexity and beauty of The Rocks and the existing cityscape.Jeff Xu, Golden Age Group
Sponsored
Functional Coatings - Anzac Memorial

Functional Coatings - Anzac Memorial

ECOTONE

CollaborationArchitects: Johnson Pilton Walker (JPW) and the Government Architect’s Office.Builder: Built.Material & ApplicationFunctional Coatings were applied to precast concrete elements to protect the memorial from carbonation in addition to giving the surface self-cleaning and air-purification propertiesOutcomeA stunningly sustainable multi-award winning project that includes the prestigious Sulman Medal. Our team is so proud to have played a part in the preservation of one of Sydney’s most iconic monuments, a symbol of our history and our future.TestimonialThe Anzac Centenary Project not only realises the vision from our past, it will continue to remind future generations of the contributions made by our servicemen and women.The Right Hon. Clover Moore, Lord Mayor of Sydney
Sponsored
The River Building, London

The River Building, London

Boon Edam Australia Pty Ltd

Known as being positioned within one of the most popular positions within London, The River Building sits comfortably between London Bridge, St Paul’s, and Bank. The position offers enviable commutes for the city workforce, boasting a five minutes’ walk from six key tube stations. Renovated to utilise a once void entrance, The River Building is now a self-contained office space with a contemporary industrial design. The large atrium features a set of sleek black Lifeline Speedlane Swings. Stiff + Trevillion working with Blackstone Group, had specified early into the design process for the Lifeline Speedlane Swing, due to its existing specification in existing projects. The new two-story building boasts a spacious atrium that combines naked brick walling with warm feature lighting and dark tones. Mimicking the interior styling a bank of Lifeline Speedlane Swings were to be finished in black RAL. The River Building with an occupancy density of 1:8 requested comfortable yet stylish entry resulting in a wider lane width configuration. The 615mm passage width utilises two glass wings that offer fast access but give the illusion of openness.
Sponsored
Ivanhoe Apartments

Ivanhoe Apartments

Sculptform

Ivanhoe’s newest building is a landmark you can’t miss. The facade components of light bricks, dark cladding and luminous aluminium Click-on Battens perfectly complement each other, creating a contemporary finish. The interior also features our battens, which seamlessly connects to the exterior. The building comprises a three-level basement, ground floor retail outlets, two levels of offices and multiple fully appointed apartments among the two upper levels. The building is bordered on three sides by busy public roads which posed logistical challenges with its construction. However, the speed and ease of installing Click-on Battens alleviated this issue on the upper levels. The curved facade is wrapped in Sculptform aluminium Click-on Battens. They were installed upon standard and curved tracks which were delivered to site in a flexible state so that they’re able to be wrapped around the substrate and hug the exterior. Batten clips are factory fixed to the tracks at the spacing sequence that is specified. Helping to save time installing on-site. Battens are simply push-clicked onto mounting tracks that are positioned behind the battens in a concealed manner.
Sponsored
Arthur Cox, Dublin

Arthur Cox, Dublin

SAS International Australia

Ireland’s second largest legal firm, Arthur Cox, has moved to its new headquarters, Ten Earlsfort Terrace, Dublin. Located a stone’s throw from St. Stephen’s Green, the LEED Platinum fit-out building is a marker of sustainable design. Architects, Scott Talon Walker, had a specific design requirement in mind so chose SAS International for their longstanding relationship and expertise. To accommodate the number of recurring apertures, Scott Talon Walker collaborated with SAS to create bespoke service panels within the SAS330 hinged mega panel tartan grid. The panel design features five unperforated squares which create a single unit capable of housing fire detectors, movement sensors and other electrical devices. These unique panels satisfy the client’s M&E stipulations, ensuring the building’s sustainable performance well into the future. Additional SAS systems installed include: SAS500 acoustic lighting baffles and SAS150. Both of these systems assure complete design flexibility and service maintenance in equal measure. Nominated for Fit Out Project of the Year – Large Office, SAS International has once again exceeded the mark to deliver premium metal ceiling solutions for its client.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.

Showing 37-44 of 44

Feedback