NBS Source
I'm a manufacturer

"roof beams precast concrete"

665 results found

Sort by:

Showing 37-49 of 49

Sponsored
Amazon Virginia Headquarters

Amazon Virginia Headquarters

CarbonCure

Amazon HQ2 is part of the Metropolitan Park site, an existingurban renewal and development project in National Landing.The first phase of our “ground-up” construction will see theredevelopment of a block of vacant warehouses into two newLEED Platinum-certified buildings, new retail space for areabusinesses, and plenty of open space for the community toenjoy. These buildings are the first step to creating an urbancampus where Amazon’s future 25,000 employees and thelocal community can live, work and play.Miller & Long delivered an estimated 106,555 cubic yards(81,467 cubic metres) of concrete made with CarbonCure, whichwill save approximately 2,522,000 pounds (1,144 tonnes) of CO2.
Sponsored
Chadstone Shopping Centre, Australia

Chadstone Shopping Centre, Australia

Guardian Glass (Australia)

The Chadstone Shopping Centre in Melbourne, Australia, is an amazing piece of engineering and architecture. With its stunning gridshell glass roof, the extended building is now the largest enclosed shopping centre in the Southern Hemisphere.
Sponsored
Crystalbrook Kingsley

Crystalbrook Kingsley

ECOCLEAN

COLLABORATIONArchitect: EJE ArchitectsBuilder: Core Project GroupBRIEFDevelop the best coating system to maintain the surface appearance of the restored heritage-listed Kingsley building to align with its vision of being a true luxury hotel.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEThe ECOCLEAN coating system uses self-cleaning technology to preserve the concrete appearance of the Kingsley – the first luxury hotel in Newcastle.Winner of two Asia-Pacific Hotel of the Year awards, the Kingsley is a remarkable example of what photocatalyst coatings can do to preserve the appearance of heritage-listed buildings while reducing maintenance budgets.Images courtesy of Crystalbrook Kingsley
Sponsored
One New Change, London

One New Change, London

SAS International Australia

One New Change features SAS International bespoke metal ceiling panels with an expanded metal mesh, finished in silver, red and black. The ground-breaking, bold and perceptive £300 million One New Change mixed-use development project won the MIPIM AR Future Project Award 2010. Now complete, the building has become known as the ‘Stealth Bomber’ after the radar-proof combat plane that inspired its faceted form and has also won a RIBA 2011 Award for London and LDSA Building Excellence Award. The design incorporates pedestrian arcades converging at the core of the building, reinstating a historic north-south pedestrian route and allowing new panoramas of London’s landmark St Paul’s Cathedral. SAS International supplied the ceiling solution for the retail corridors of the development with a concealed suspension system, working closely with the architects to create a result where no visible fixings can be seen through the ceiling plane. To complement this, bespoke metal ceiling panels were produced with an expanded metal mesh, finished in silver, red and black. A challenging material to work with, to ensure the mesh held a uniform shape and corners for the panels could be formed accurately, SAS International’s solution was to create a ‘picture frame’ behind each panel. This also helped to provide support for the concealed attachment bolts. Design challenges at One New Change included the building grid size and shape (it was termed the most difficult site in Europe), the complex geometry of the structure (including some tight ceiling to structural beam heights), and a shared fire strategy between retail and office storeys. Requirements to achieve an environmentally-friendly building, complying with Part L and BREEAM ratings, were also critical and the design uses a materials palette of limestone, metal, mirror and a new method of fritted glass on the exterior to help shield the interior from glare.
Sponsored
Farr Institute, Edinburgh

Farr Institute, Edinburgh

SAS International Australia

The Farr Institute in Edinburgh is a collaboration between six Scottish Universities and the NHS National Services Scotland. They aim to place the country as a global leader in health informatics research whilst improving the health of the Scottish population. 30,000 sq. ft. has been fitted out to accommodate Bio Incubator laboratories and offices together with meeting, conference and dining facilities. The remainder of the building will accommodate laboratories and offices for life science research. SAS International’s acoustic baffles were specified to meet acoustic demand and make the most of the high ceilings and breathable space. The colours, baffle layout and service integration were carefully co-ordinated to the brief. SAS130 and SAS330 were specified and installed in the central core. Both systems offer quick and easy access to otherwise hidden mechanical and electrical systems. With SAS130, tiles can be lifted out to gain access to the ceiling void. SAS330’s hinge notch allows tiles to be hung vertically from C-Profiles, providing unobstructed access to the ceiling void. Ray Kwiecinski at Michael Laird Architects gave the below quote on working with SAS International; “MLA has specified a variety of SAS International’s lay-in grid ceiling systems over the years and we have always been extremely satisfied with the finished product. At the Farr Institute however, we decided to create a feature of the structural soffits and the M&E services and, by careful coordination of these services, the steel beams… [With] the SAS Baffle System and SAS Raft System 600, we were able to create an open, collaborative and exciting office environment whilst maintaining a high degree of sound absorbency. Our Client is delighted with the results as are we.” The Institute’s independent research will support innovation in the public sector, leading to advances in preventative medicine, improvements in NHS care and better development of commercial drugs and diagnostics.
Sponsored
Span+ & EasyMech MR - Mixed Use Project, TAS

Span+ & EasyMech MR - Mixed Use Project, TAS

Con-form Group

This project is a great example where the client wanted to realise the instant savings of Con-form Group’s engineer certified, rafter mounted system, over costly traditional mounting systems.With a mixture of our EasyMech MR (purlin-mounted), and Span+ (rafter-mounted), HVAC platforms - the client was able to successfully mount all mechanical units across the roof of this mixed-use development in Tasmania.Spanning over 9 metres, this retrofitted Span+ (rafter-mounted), installation answered the clients brief in more ways than one.Rated to 2.5kPa and attached to Con-form Groups proprietary steel stub columns – this platform and it’s screens were retrofitted to the roof of this shopping centre within 2 days.Paired with our Louvre airflow and Classic Screen Walls.
Sponsored
Functional Coatings - Crystalbrook Kingsley

Functional Coatings - Crystalbrook Kingsley

ECOTONE

CollaborationArchitect: EJE ArchitectureBuilder: Core Project GroupBreifDevelop the best coating system to maintain the surface appearance of the newly restored heritage-listed Kingsley building to align with its vision of being a true luxury hotel.Material & ApplicationECOCLEAN Porosity CoatingECOCLEAN Self-Cleaning CoatingOutcomeThe ECOCLEAN coating system uses self-cleaning technology to preserve the concrete appearance of the Kingsley – the first luxury hotel in Newcastle. Winner of two Asia-Pacific Hotel of the Year awards, the Kingsley is a remarkable example of what photocatalyst coatings can do to preserve the appearance of heritage-listed buildings while reducing maintenance budgets.TestimonialAn old soul with a fresh twist, Crystalbrook Kingsley is culturally connected, sustainably-led, simply sophisticated, and steeped in history. The first luxury hotel to grace Newcastle, Crystalbrook Kingsley sparks vibrant energy and nostalgia in one moment.
Sponsored
Functional Coatings - Parramatta Leagues Club Carpark

Functional Coatings - Parramatta Leagues Club Carpark

ECOTONE

CollaborationArchitects: HassellBuilder: ADCO ConstructionsBrief Protection of the carpark’s white appearance from staining, soiling and future graffiti strikes.Material & ApplicationECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOutcomeAfter a number of years since application, the car park continues to self-clean and keep its as-new white appearance through the photocatalytic properties of our ECOCLEAN dual coating system. Harmful compounds are continuously broken down when they come into contact with a coated surface in addition to benefiting from graffiti resistance.Testimonial“This is an example of our functional and protective coatings removing the barriers to having white or fair-faced concrete or cladding in building designs. Their self-cleaning, anti-carbonation, anti-fungal, and graffiti resistant properties mean buildings look as good as new, enabling fresher and lighter colours to be more prevalent in our built environment.”Tony Watling, CEO ECOTONE & ECOCLEAN, Australia & New Zealand
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
Bourke Street Contemporary Office & Living Space, NSW

Bourke Street Contemporary Office & Living Space, NSW

Breezway Australia Pty Ltd

Designed by Smart Design Studio, the building is an honest layering of old and new as expressed by the raw treatment of the exterior façade through to the smooth, modern interior. The rooftop addition connects the double-height banks of glass Breezway Louvres with an articulated aluminium roof folding down as a screen to the back of the building. The end result successfully incorporates flexible and functional office interiors and a two-bedroom rooftop apartment within a rigorously controlled contemporary architecture of old and new.
Sponsored
Ferrero Rocher

Ferrero Rocher

Boon Edam Australia Pty Ltd

Ferrero’s new global HQ gathers in one building with nearly 1,300 people, previously spread over five different offices. The building, with a total floor space of almost 30,000 m², opened in December 2019. The building is designed to evoke the atmosphere of an Italian square: a vast atrium is surrounded by two multi-storey office wings. Boon Edam was appointed to craft and install the golden revolving door, on behalf of facade builder Groven + Portal, who in turn worked for general contractor Felix Giorgetti. The colour of the revolving door makes a visual reference to the world-famous golden chocolate - Ferrero Rocher. The Casa Ferrero administrative building consists of two blocks built on a common basement. It was the combination of these plots, and the architectural skills, that resulted in what you see today: a building that is both impressive and elegant as well as being a pleasant and functional workplace for the employees of the food group. Ferrero’s colours are subtly incorporated into the classic facades, with bronze tones and a gilded effect over the windows as well as the entrance glass panels. This effect was achieved by applying a gold-coloured textile fabric to the laminated glass during the project’s construction. Behind the glass facade of the entrance, the most jaw-dropping area of Ferrero’s headquarters unfolds - a central atrium that connects the two blocks and is entirely covered by a glass roof. The spacious atrium is designed to function as a reception and meeting space. Horizontal circulation between the two blocks is facilitated by connecting walkways with a range of 20 meters. The vertical circulation occurs through panoramic glass elevators. The central atrium’s glass-roofed space is open to life within the company and encourages interaction between employees. This 11-storey building, including six upper levels (ground floor + 5 floors) and five lower levels, adapts perfectly to its urban surroundings. The office areas are spread over nine floors, taking advantage of maximum light for the interior space. Levels -3 to -5 include technical areas and parking spaces. Ferrero’s wish was for a functional and pleasant building for everyone who works there. We think they have achieved this in spades!
Sponsored
Hotel Jakarta, Amsterdam

Hotel Jakarta, Amsterdam

Boon Edam Australia Pty Ltd

Imagine waking up in this 4-star luxury hotel with panoramic view of the IJ and the city of Amsterdam. Hotel Jakarta: a BREEAM Excellent certified energy-neutral hotel in Amsterdam. Designed with sustainability in mind. Unique for the Netherlands is the 30-meter-high timber structure of the hotel. All columns, ceilings and frames are made from natural, FSC or PEFC certified wood. The south and east façades are covered with 700 m2 of building-integrated solar energy panels (BIPV panels). The glass roof that covers the atrium also contains BIPV cells that, in addition to collecting energy, also function as sun blinds for the subtropical inner garden. The atrium is the center of the hotel and works as a temperature controller in both summer and winter. On each side of the building, rooms have their own covered outdoor space that functions as a structural awning. A custom made revolving door provides access to the hotel where there is a dynamic public area with various bars, restaurants, coffee corners and a wellness center. This transparent revolving door is almost 6 meters high and fits perfectly with the appearance of the facade. In addition, this type of entrance solution is in line with the sustainability requirements of the building.
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager

Showing 37-49 of 49

Feedback