NBS Source
I'm a manufacturer

"air conditioning systems"

194 results found

Sort by:

Showing 37-72 of 151

Sponsored
Victoria Gardens Shopping Centre, VIC

Victoria Gardens Shopping Centre, VIC

Sculptform

The refurbishment of the Victoria Gardens shopping centre designed by Colab Design Studio uses Sculpform's Aluminium Click-on Batten system to create a stunning curved Oculus, along with feature walls and ceilings throughout the centre. Sculptform’s Click-on batten system provided a unique solution that could be customised to address the incredibly complex geometry of the existing architecture. Being able to use the same system for the mall cladding, mall ceiling installations and the oculus cladding ensured absolute consistency across the entire centre.
Sponsored
Adelaide Convention Centre, SA

Adelaide Convention Centre, SA

Rondo Building Services Pty Ltd

The project has called on our Technical Services Team for wall and ceiling designs, with significant quantities of Rondo systems used in the project including Rondo Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and PANTHER Access Panels.
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
The Podiums, QLD

The Podiums, QLD

Rondo Building Services Pty Ltd

For instance, Superior faced the challenge of creating curved detailed bulkheads and feature ceilings. However, with Rondo’s help using a hybrid of the Rondo KEY-LOCK Concealed Ceiling System and Stud & Track Wall Framing System, they managed to create a great outcome.
Sponsored
Moonee Ponds, VIC

Moonee Ponds, VIC

Rondo Building Services Pty Ltd

Rondo Technical Representative Tino Cucinotta, worked closely with the 2DG team – and assisted with the supply of QUIET STUD Acoustic Wall System, Stud & Track and Finishing Sections, whilst Rondo’s newly released XPRESS Drywall Grid Ceiling System was due to arrive, ensuring the project could continue efficiently.
Sponsored
Al Zeina - Al Raha Beach, Abu Dhabi

Al Zeina - Al Raha Beach, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo has supplied the external framing system for EIFS façade system in the Al Zeina development. Al Zeina is the strategic gateway to the new Al Raha Beach Development where the natural beauty of Abu Dhabi is captured by the creation of a collection of formal Arabic gardens, courts and plazas in the tradition of gardens of the world.
Sponsored
Peppers Pier Resort, QLD

Peppers Pier Resort, QLD

Rondo Building Services Pty Ltd

The Rondo Technical Services Department worked closely with CSR Gyprock to come up with a suitable External Wall system. The project consists of over 30,000 lineal metres of 92 1.15bmt lipped studs used for the external wall system and over 45,000 lineal metres of 64mm 0.50bmt lipped studs for the internal walls.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing Rondo 92mm Stud & Track Systems, KEY-LOCK Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Kilmore Street Medical Centre, NZ

Kilmore Street Medical Centre, NZ

Rondo Building Services Pty Ltd

Rondo worked with Forman Commercial Interiors and Alpha Holdings on the three storey, $40 million project by providing all of the Steel Stud and Track requirements along with the KEY-LOCK Concealed Suspended Ceiling System. Due to the various wall systems designed, Rondo supplied diagrammatic specifications for the junction details to assist in completing the project, which finished in August this year.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing 92mm Stud & Track Systems, Key-Lock Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Silkstone State School Parking Bays

Silkstone State School Parking Bays

Atlantis

APPLICATION: 52mm Drainage Cell.PROJECT LOCATION: Silkstone Qld.PROJECT DETAILS: Parking Bays at the Silkstone Primary School.PROJECT COMPLETION: Sep 2013.Atlantis system saves big old tree.At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But, in the proposed car park was a huge old tree. The tree could be cut down and the roots dug out or the tree couldbe left, with open soil above the root system to allow for infiltration to keep the tree healthy; but this would lose atleast six car spaces. What was to be done?The answer turned out to be simple – keep the tree, but surround the tree with Atlantis® Gravel Cell™ 52mm cells.Hence while the rest of the car park was sealed, the areaaround the tree was prepared and the 52mm cells werelaid and clipped together there and filled with 10mmgravel. This area was of sufficient size to provide 3 carplaces on each side of the tree and a driveway in frontof the tree, while at the same time allowing rainfall toinfiltrate through the gravel into the root system.Thus we had a win-win situation. Not only was the treesaved, and money saved on not having to remove it, butthe root system of the tree was protected by the GravelCell™ system, and six extra car spaces were created.
Sponsored
Wynn Place, Macau

Wynn Place, Macau

Rondo Building Services Pty Ltd

The hotel and casino will include a luxury hotel, gaming areas, dining, and retail and convention facilities along with numerous special attractions. Rondo provided this project with all the Drywall Steel Stud Partition Systems for the podium, gaming areas and the hotel tower. Included in the plan were also specially designed and supplied maintenance WALK–ABOUT Trafficable Ceiling Systems as per the project requirements.
Sponsored
Shrine of Remembrance

Shrine of Remembrance

Interpon Powder Coatings

A significant Melbourne landmark, Victoria’s Shrine of Remembrance has undergone a major redevelopment by local firm ARM Architecture. Completed in late 2014, the redesign accommodates new requirements of the memorial that have evolved in recent years, while respecting the original design by Hudson and Wardrop, thus ensuring the memorial’s use by future generations.  Built between 1928 and 1934 to honour those who served in the First World War, the Shrine was inspired by the tomb of King Mausolus, one of the seven wonders of the ancient world. In the late 1990s, the Shrine of Remembrance Trustees embarked on a bold plan for the site. Access to the upper levels of the Shrine was problematic, especially for veteran visitors, and public visitation was increasing as younger generations came to understand the legacy of their forebears. Accordingly, the Shrine’s collections were expanding with donations of artefacts from families and a growing need for education facilities and an improved visitor experience became evident.  In 2001, ARM Architecture were commissioned to develop a master plan to develop the Shrine. Following the original 1920s design, ARM proposed four symmetrical zig-zag shaped courtyards, allowing access to the undercroft spaces under the existing structure which now house gallery areas, an auditorium, dedicated education rooms, an archive and offices. Stage 1 of the project saw the Visitor Centre and two of the courtyards completed on the north side of the structure in 2003. Stage 2 expanded the undercroft with the addition of the Education Centre and Galleries of Remembrance, and the final two courtyards. ARM Design Architect Jeremy Stewart explains “It was important that each of the courtyards had a distinct feel”. The open air Student Entry Courtyard offers a separate entrance to the Shrine for school groups, with a large sculptural poppy, the flower of wartime remembrance, suspended overhead. With the colour red notorious for fading on external structures, Interpon Powder Coatings recommended a system that would be colourfast. In a high traffic space that closes for only two days each year, with the additional solemnity of the memorial environment, choosing a product that would last the distance and require minimal maintenance was essential to this project. Interpon’s D2015 Gold Global Warranty offers the Shrine Trustees this assurance. Working with Locker Group, HDM Metal, an experienced fabricator and Interpon Approved Applicators AAF Vic and Powdercoating Services ACT as exclusive warrantors provided further reassurance of the product quality.  The giant overheard poppy features Interpon D2015 Ultriva™ R15 Crimson Matt YG215A and its support structure Interpon D2015 Ultriva™ Ebony YN201A. On the south west diagonal, the Terrace Courtyard features a lush green referencing South East Asian inspired garden. Amidst the greenery, laser cut aluminium panels coated in Interpon D2015 Ultriva™ R14 Waratah Matt YG222A list the names of Victorian towns, providing a reference point for visitors. The zig-zag shape of the terrace courtyards infer irregular exposure to the sun, further emphasising the need for a product of premium quality. “Interpon are interested in and open to ideas”, says Stewart, making this a win-win collaboration for the architects of this redevelopment of Victoria’s premier place of remembrance.  
Sponsored
Adelaide Medical Nursing School (AMNS), SA

Adelaide Medical Nursing School (AMNS), SA

Rondo Building Services Pty Ltd

Rondo’s Seismic products within each system included DUO Perimeter Trim Sliding Clip (Rondo 850), KEY-LOCK TCR Seismic Joiner (Rondo 865) and Seismic plenum braces. With the KEY-LOCK Seismic Concealed Ceiling System, two-side fixed, free wall perimeter connections and Rondo 141 Wall Track (1.15BMT to suit 129 Furring Channel) was used.
Sponsored
Park Hyatt, NZ

Park Hyatt, NZ

Rondo Building Services Pty Ltd

Due to tight plenum space and extremely congested plenum areas, Rondo’s new Xpress Drywall Grid System was the ideal ceiling system to use. This maximised the ceiling heights in all guest rooms while offering compliant plenum vertical clearances. Contractors implemented Rondo’s intricate feature ceilings and bulkheads throughout the entire building, such areas included the lobby, restaurants and conference areas.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Ovo Green Square - Bike Parking for an Iconic Building

Ovo Green Square - Bike Parking for an Iconic Building

Cora Bike Rack

When deciding on bicycle parking solutions for the Ovo project, Cora Bike Rack presented its range of innovative product designs that could tailored for this special project. In order to provide maximum capacity and accessibility, Cora’s E3DT-GT double tier system, E3VR vertical wall mount system and CBR bike parking rails were combined to offer the ultimate AS2890.3 compliant EOT facility.
Sponsored
Santiago Airport, Spain

Santiago Airport, Spain

SAS International Australia

A Tricell system was designed by SAS International to fit the "Y" shaped departure lounge at Santiago Airport. SAS International has designed, manufactured and installed metal ceiling solutions for both interior and exterior areas of the new 74,000m² terminal of the Aeropuerto de Santiago, Spain. SAS810 tricell has been installed to create a triangular aesthetic in the departure lounges. This open cell system provides a geometric form that can easily be repeated for a striking finish. The flexible approach in SAS International’s design process enabled this unique solution to fit within the ‘Y’ shaped designed departure lounge. Installed in the main terminal and baggage hall, as well as exterior ceiling areas, is the linear profile system SAS710. The linear slat ceiling, designed so that each slat lines up neatly with the next, forms a perfect row resulting in clean and simple architectural lines. SAS710 was also chosen for the exterior of the building to provide continuity of design. Using specially designed slat retaining angles, the system has been adapted for strength and durability to prevent slats from being dislodged in high wind.
Sponsored
Fiona Stanley Hospital, WA

Fiona Stanley Hospital, WA

Rondo Building Services Pty Ltd

Rondo has supplied 80,000l/m of DUO Exposed Grid Ceiling System and 148,000 L/M of Steel Stud Drywall Framing System to three of the main buildings. As the design required a variety of special length products, Rondo has been producing large quantities of these items in advance and storing them at the Rondo warehouse in WA to enable quick supply and install for contractors on site, which ensures the project can progress at a rapid rate.
Sponsored
Blue Cross Age Care, VIC

Blue Cross Age Care, VIC

Rondo Building Services Pty Ltd

MP Group were charged with managing the installation and finishing of all internal and external walls and this is also where Rondo offered our support. With the external structural steel framing having been installed 150mm out of position, Rondo’s Technical Services Team came to the rescue and designed an external stud wall system using our MAXIframe External Wall Framing System to ‘fill the gap,’ including design of special header bracing details to support the wall.
Sponsored
No.1 Collins Wharf, VIC

No.1 Collins Wharf, VIC

Rondo Building Services Pty Ltd

No 1. Collins Wharf is the latest part of the $1.2 billion development of the Victoria Harbour precinct. The 29-level apartment complex, built by Lend Lease and designed by Architectural firm, Bates Smart was completed in September this year and boasts 321 water-lined apartments and townhouses. Expoconti were awarded the wall and ceiling contract for the $106M development and soon after contacted Rondo to supply systems for the external walls, external cladding and internal suspended ceiling system.
Sponsored
Star of the Sea College, Brighton, VIC

Star of the Sea College, Brighton, VIC

Alspec

Looking back at one of the first buildings to use Alspec’s ecoWALL 225 structural framing system.
Sponsored
Multi-level Apartments with Enclosed Balcony, NSW

Multi-level Apartments with Enclosed Balcony, NSW

Breezway Australia Pty Ltd

Designed by Tony Owen Partners, Breezway Altair Louvre Windows were recommended to the Developer by the Architects at Tony Owen Partners due to their visually appealing aesthetics, the products full certification and compliance with Australian Standards, and Breezway’s strong reputation in the window industry. Altair Louvres with the Stronghold System have been strategically placed on the corner of the building as a key visual feature. Being a high quality window system, Altair Louvres will provide protection from the elements and are restricted to comply with Fall Prevention requirements.
Sponsored
Sir Edward Weary Dunlop Retirement Village, VIC

Sir Edward Weary Dunlop Retirement Village, VIC

Rondo Building Services Pty Ltd

The Sir Edward Weary Dunlop Retirement Village has been completed with the help of architect, builder and contractor Ryman Healthcare. The 134-unit age care facility will house serviced care units and independent living units for the elderly with resort-style facilities. Rondo assisted in the development of this project, supplying a number of products including Stud and Track (64mm and 92mm x 0.55BMT), KEY-LOCK Suspended Ceiling Systems and MAXIjamb Systems for the large window and door openings leading onto balconies.
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.
Sponsored
Bailey Hotel and Resort

Bailey Hotel and Resort

Mapei Australia Pty Ltd

Installation of floor and wall coverings, Sealants application, Surface preparation, Tile & stone installation systems, Waterproofing
Sponsored
Dubai International Airport - Concourse 4, Dubai

Dubai International Airport - Concourse 4, Dubai

Rondo Building Services Pty Ltd

Rondo Steel Stud Drywall Framing System will be used in the construction of the Dubai International Airport - Concourse 4 project.
Sponsored
Farr Institute, Edinburgh

Farr Institute, Edinburgh

SAS International Australia

The Farr Institute in Edinburgh is a collaboration between six Scottish Universities and the NHS National Services Scotland. They aim to place the country as a global leader in health informatics research whilst improving the health of the Scottish population. 30,000 sq. ft. has been fitted out to accommodate Bio Incubator laboratories and offices together with meeting, conference and dining facilities. The remainder of the building will accommodate laboratories and offices for life science research. SAS International’s acoustic baffles were specified to meet acoustic demand and make the most of the high ceilings and breathable space. The colours, baffle layout and service integration were carefully co-ordinated to the brief. SAS130 and SAS330 were specified and installed in the central core. Both systems offer quick and easy access to otherwise hidden mechanical and electrical systems. With SAS130, tiles can be lifted out to gain access to the ceiling void. SAS330’s hinge notch allows tiles to be hung vertically from C-Profiles, providing unobstructed access to the ceiling void. Ray Kwiecinski at Michael Laird Architects gave the below quote on working with SAS International; “MLA has specified a variety of SAS International’s lay-in grid ceiling systems over the years and we have always been extremely satisfied with the finished product. At the Farr Institute however, we decided to create a feature of the structural soffits and the M&E services and, by careful coordination of these services, the steel beams… [With] the SAS Baffle System and SAS Raft System 600, we were able to create an open, collaborative and exciting office environment whilst maintaining a high degree of sound absorbency. Our Client is delighted with the results as are we.” The Institute’s independent research will support innovation in the public sector, leading to advances in preventative medicine, improvements in NHS care and better development of commercial drugs and diagnostics.
Sponsored
iFly Indoor Skydiving Centre, WA

iFly Indoor Skydiving Centre, WA

Rondo Building Services Pty Ltd

Working directly with sub-contractors Donnybrook Interiors and Architectural Ceiling Systems, Rondo delivered the walls and ceilings for this unique $15million build.
Sponsored
Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Hempel

At the new 6,000-seater Jordal Amfi ice hockey stadium in Oslo, Norway, player and spectator safety is a top priority. The stadium owner wanted a coating system which included passive fire protection, so, when Danish-based Give Steel was contracted to produce the steel structures, they had to not only meet the customer specification for fire protection but also consider the logistics of the project.The steel pieces were produced in Denmark, and Give Steel needed a coating system that was robust enough to protect the steel during transportation and erection onsite.
Sponsored
Eqwater, Paris

Eqwater, Paris

SAS International Australia

Acoustic SAS International metal ceiling systems were installed in the eight-storey Eqwater office building in Paris. SAS International’s SAS330 was installed throughout the office areas in the building. SAS330 is a lay-in metal ceiling tile system that provides functionality and outstanding acoustic performance for a range of cost-effective design options. The practical nature of its structure allows ease of construction and maintenance. The corridors of the building were fitted with SAS International’s SAS205. In some areas it is not possible to use a standard hanging bracket due to the number of services in the ceiling void, SAS205 is supported at the perimeters, up to a maximum width of 3000mm, making it a perfect solution for corridors. Metal offers an inert and inherently hard-wearing surface, making metal ceiling systems both hygienic and a low-maintenance option over the course of their lifespan. Only a simple cleaning routine is required. The lifespan of SAS International’s metal ceilings is in excess of 25 years with only very basic maintenance.
Sponsored
Double One 3, Teneriffe, Brisbane QLD

Double One 3, Teneriffe, Brisbane QLD

Alspec

Residents of this lifestyle-focused development enjoy uninterrupted city, river and district views thanks to generous balconies enclosed with Alspec’s EndurAl balustrade system.
Sponsored
Thuringowa RSL, Townsville, QLD

Thuringowa RSL, Townsville, QLD

Alspec

The exciting product partnership combining Alspec aluminium window framing with Breezway dual-glazed louvre systems is highlighted in this redevelopment of an RSL club in North Queensland.
Sponsored
C2 Esplanade, NT

C2 Esplanade, NT

Rondo Building Services Pty Ltd

Rondo incorporated Steel Stud and Track, specifically 64mm track sections along with KEY-LOCK Suspended ceiling systems to perfect the final look of the complex.
Sponsored
Ready to Set Sail at the Brisbane International Cruise Terminal

Ready to Set Sail at the Brisbane International Cruise Terminal

Flowcrete

The brand new state-of-the-art $177 million Brisbane International Cruise Terminal was completed in mid-2020 and will serve as a gateway for the Queensland tourismsector. The 9,300m² terminal was designed by Arkhefield in collaboration with Arup will provide visitors with a world class experience.The public spaces including the internal walkways, communal areas and departure lounge featured 1,500m² of Flowcoat Terrosso in four bespoke colour combinations.The decorative resin-based flooring system was chosen to provide a decorative, seamless flooring system that would not only create a luxurious and welcome environment, but withstand the expected foot traffic.A further 1,200m² of Deckshield ID was applied to the foot bridge, providing passengers with a slip resistant and safe surface as they board or disembark some of the biggest cruise ships in the world.Tremco CPG Australia’s portfolio of industry leading products provided not just a flooring solution for the world-glass tourism facility. In addition to the Flowcreteflooring systems, Tremco CPG Australia also provided the structural glazing silicone Proglaze II to a total of 218 glass panels.
Sponsored
ANZAC Memorial

ANZAC Memorial

Tremco

About the ProjectThe ANZAC Memorial was designed as a sculptural monument, a unique collaboration between Architect Charles Bruce Dellit and sculptor George Rayner Hoff; it is arguably one of the finest examples of the union of architecture and art in Australia.The building is a striking architectural form, symmetrical on both axes. It uses elements reminiscent of traditional Gothic architecture (buttresses, cathedral windows, high ceilings) in the Art Deco style. The Memorial is adorned externally with twenty sculptures representing the units of the Australian Imperial Force (AIF). These are the sentinels of the building, keeping watch while representing the fallen to whom the building is dedicated.Bruce Dellit’s vision for the Memorial included a still pool bounded by poplars to the north of the building (included for their significant symbolic association with the battles in France and Belgium), and a cascading fountain to the south.The Hall of Service, at the centre of the Centenary Extension, is a civic space that architecturally and artistically mirrors the Hall of Silence. The Hall was named in acknowledgment of the original Memorial halls and to recognise more than a century of service by Australian servicemen and servicewomen. At the threshold to the space are the words: “NSW Service with and for All Australians”.The ChallengeWhen restoring a National War Monument visited by hundreds of thousands of people, you need to provide the highest quality results and finishes expected of such a significant structure in our history. The challenge here, comes from creating a restoration solution on a building which was designed in the early 1930’s, which will be flexible enough to maintain the architects core design features but also created and executed within a tight time frame in time for ANZAC day. The solution needed to encompass modern technology with traditional design features to ensure the restoration lasts for the next 100 years as a memorial to our fallen heroes.Tremco SolutionTremco worked closely with Sure Seal and Built to provide a solution which was both timely and high quality. the installers long standing relationship with Tremco, a number of unique solutions, together with a 20 year warranty period proved a success.Over 15,000m2 of Tremco products were installed on this historic site. Tremco provided regular iAudit reports on the job site (iAudits is a quality control measure used to ensure the products are being applied consistently to maintain warranty conditions) During regular site visits, Tremco were able to provide a high level of customised Technical information and design advice to ensure the project ran smoothly and to Built’s expectations.

Showing 37-72 of 151

Feedback