NBS Source
I'm a manufacturer

"refrigeration installations components"

687 results found

Sort by:

Showing 37-72 of 89

Sponsored
Coogee Oval Refurbishment, NSW

Coogee Oval Refurbishment, NSW

BRITEX Metal Products

Britex are proud to be involved in Randwick City Council’s refurbishment of Coogee Oval in NSW. Featuring a comprehensive upgrade of the current landscape, the installation of brand new facilities including male, female and accessible bathrooms feature Britex’ Signature high quality public amenities products such as vandal resistant toilets, hand basins and slab urinal and urinal pods. The Britex products installed as part of this project include: Britex Vandal Resistant Wall Mounted Round Basins (Product Code HBWMR)Britex Vandal Resistant Accessible Hand Basin (Product Code HBDA) Britex Centurion Accessible Pans with Vandal Resistant Toilet Seats (Product Code PCD) Britex Centurion Ambulant Pans with Vandal Resistant Toilet Seats (Product Code PCAM) Britex Centurion Standard Pan with Vandal Resistant Toilet Seats (Product Code: PC-SVRC-B) Britex Vandal Resistant Sanistep Urinal with Smart Sensor Flush Britex Vandal Resistant Sensor Activated Urinal Pods (Product Code: URAM)
Sponsored
Eqwater, Paris

Eqwater, Paris

SAS International Australia

Acoustic SAS International metal ceiling systems were installed in the eight-storey Eqwater office building in Paris. SAS International’s SAS330 was installed throughout the office areas in the building. SAS330 is a lay-in metal ceiling tile system that provides functionality and outstanding acoustic performance for a range of cost-effective design options. The practical nature of its structure allows ease of construction and maintenance. The corridors of the building were fitted with SAS International’s SAS205. In some areas it is not possible to use a standard hanging bracket due to the number of services in the ceiling void, SAS205 is supported at the perimeters, up to a maximum width of 3000mm, making it a perfect solution for corridors. Metal offers an inert and inherently hard-wearing surface, making metal ceiling systems both hygienic and a low-maintenance option over the course of their lifespan. Only a simple cleaning routine is required. The lifespan of SAS International’s metal ceilings is in excess of 25 years with only very basic maintenance.
Sponsored
Heathrow Airport, Terminal 4

Heathrow Airport, Terminal 4

SAS International Australia

The £70 million project saw SAS International design and manufacture bespoke spun alum­inium profiled discs, acoustic metal wall panelling and System 600 rafts in the new terminal. The architects 3D Reid had to make the building light, airy and modern yet the façade and various materials used within the terminal had to withstand potential of a security breach. All products installed ‘land-side’ were required to meet the requirements of Aviation Security in Airport Development (ASIAD). The result answers aesthetic demands, yet provides the highest level of performance for the requirements of the building. For the design to be realised, square aluminium sheets were cut by the manufacturer into a circle and spun into a dome. Installation in such an environment means safety cables had to be attached to each disc, wall panel, tile and raft to ensure they do not fall and cause injury. Allowance for safety cables to be attached had to be taken into consideration during the design phase. Large vertical wall panels with an ultra-micro perforation were also specified to provide the necessary acoustic properties required for this vast open space. The very fine 0.7mm perforation, with 1% open area, helps to manage acoustics within the large open spaced terminal. The off-site modular manufacture of the architectural metalwork products meant installation was quicker, which causes less disruption to such a busy environment, and in addition there is no waste on site. Aesthetic versatility can be achieved using SAS International Architectural Metalwork throughout projects. It also allows for inte­gration of M&E services into the building design while meeting design demands and durability requirements. The range includes acoustic baffles, acoustic wall panels, air handling units, bespoke ceilings, and column casings.
Sponsored
Lakeside Joondalup, WA

Lakeside Joondalup, WA

Rondo Building Services Pty Ltd

The $200 million Lend Lease Lakeside Joondalup Shopping Centre development opened in November 2014, making it the largest shopping destination in Western Australia. Contractors C & L Ceilings in conjunction with Rondo’s Technical Services Team designed pre-fabricated sections that could be built off-site and then transported to site complete, reducing installation costs and time delays.
Sponsored
Hyatt Regency Sydney, NSW - Equitone

Hyatt Regency Sydney, NSW - Equitone

Fairview Architectural

The 5-star Hyatt Regency Sydney on the fringe of Darling Habour, formerly Four Points by Sheraton, underwent a vast redevelopment which included refurbishment of the hotel and construction of a new convention space and 25 level tower. Adorning the recognisable covered facade is Equitone Tectiva, a through-coloured fibre cement cladding, which was installed by Stane Industries. Architect: Cox Architecture
Sponsored
Waterproof Deck Coating Solution for Gawler Place

Waterproof Deck Coating Solution for Gawler Place

Flowcrete

The City of Adelaide owned and operated UPark Gawler Place provides locals and visitors with easily accessible parking in the center of Adelaide. Open 7 days a week, the undercover parking facility required an urgent trafficable waterproof deck coatingsolution.Flowcrete Australia was consulted on how the operators could prevent water leakage into the tenancies located below, whilst ensuring the structural integrity of the parking facility was maintained. An added challenge was that the facility needed to remain operational throughout the installation.Deckshield ED Rapide was the ideal solution for the unique challenges at UPark Gawler Place. The hybrid PUMMA system features the Deckshield PDS Membrane which is certified by CSIRO to AS 4654.1.2012 - the system was designed to prevent the water leakage faced by the car park operators.Over 5,500m² of Deckshield ED Rapide was applied throughout the facility. The installation took approximately 2 months to complete, as the applicators were required to approach the project section by section, whilst liaising with traffic management to ensure parking operations were minimally disrupted and the facility remained open to patrons.
Sponsored
205 Gipps Street, Abbotsford, VIC

205 Gipps Street, Abbotsford, VIC

Caroma

In the bathrooms, water-saving technologies were installed, including the 4-Star WELS rated Caroma Cube Wall-Faced Invisi Series II Toilet Suite, with its innovative Smartflush® technology and concealed cistern. The Caroma Cube Extension Wall Basin is matched with the WELS 5-star rated Caroma Liano Basin Mixer and completed with the Caroma Liano range of accessories.
Sponsored
Bundaberg Private Hospital, QLD

Bundaberg Private Hospital, QLD

Rondo Building Services Pty Ltd

Fogarty Bros, who are the main commercial plasters in Bundaberg for over 15 years, were contracted to install the internal and external linings. Due to the region’s conditions, external wall designs for cyclonic conditions were needed, pre-construction meetings were needed to discuss benefits and limitations. The builder used extra structural steel where needed and custom suit windows to fit the Rondo design.
Sponsored
Australis Apartments, VIC

Australis Apartments, VIC

Rondo Building Services Pty Ltd

Working beside Doig Architecture, Rondo provided expert design and technical advice particularly with the high internal walls. Regular on-site inspections ensured products were installed to specification and delivered on time. Rondo Technical Sales Representative Tino Cucinotta said “The project benefited from our Technical Service team who were readily available to provide design advice when required”.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Mosman Park Shopping Centre, WA

Mosman Park Shopping Centre, WA

Rondo Building Services Pty Ltd

Rondo provided Red Oak Contracts Pty Ltd with the external wall, soffit and bulkhead designs which were submitted to BADGE and Hames Sharley Architects for approval. Rondo’s technical team highlight the quality of workmanship on this project, especially when comparing the designs to the finished installation. The stock was supplied on time and accurate with Rondo working with all parties throughout this project which is a credit to all involved.
Sponsored
Elements of Byron, NSW

Elements of Byron, NSW

Alspec

Alspec’s® Hawkesbury Commercial Multi-Fold Doors along with ecoWALL225® Flush Glazed Framing accentuates the key features of the open-air main pavilion which houses reception, plus the bar and dining areas, where subtle creativity pervades in bespoke sculpture and light installations. The featuring colours are those of natural elements and the bright staff are pure Byron in their cheery welcome and smart casual uniforms.
Sponsored
1 Bligh Street, Sydney, NSW

1 Bligh Street, Sydney, NSW

Caroma

GWA Bathroom & Kitchens worked collaboratively with Architectus and Grocon to supply a full schedule of fittings, including reduced flow tapware and water saving toilet suites. This installation, together with the building’s innovative recycling technology, is saving approximately 100,000 litres of water per day, helping 1 Bligh meet its 6 Green Star rating - the highest Green Star rating for a commercial development across NSW.
Sponsored
Bendigo Hospital, VIC

Bendigo Hospital, VIC

Rondo Building Services Pty Ltd

Rondo has been a major asset to the project providing reputable advice, technical design solutions and fortnightly inspections, ensuring the development is on track and our systems are installed correctly. Our Technical Services Team has supported Rondo Victoria in assisting project architects Bates Smart Architects and Silver Thomas Hanley and builder Lend Lease improve comprehensive designs for all internal walls and ceilings for the project.
Sponsored
State Aquatic Centre, SA

State Aquatic Centre, SA

Rondo Building Services Pty Ltd

This massive project took two years of construction to complete, and Rondo’s technical services team were able to provide design solutions for challenging areas in the project. This included a heavy gauge 150mm Steel Stud Wall Framing System which required alignment with and concealment of the structural frame of the building, and a 6 metre high internal dividing wall that was subjected to higher internal pressures due to the louvres installed.
Sponsored
Sapphire on the Broadwater, QLD

Sapphire on the Broadwater, QLD

Rondo Building Services Pty Ltd

The benefit of having custom lengths sped up installation and also reduced wastage. Approximately 10,000 custom made studs were used to complete the project. Rondo also provided products used for internal lining and ceilings. During the construction stage supplying products to the site at the correct time for crane lifts was essential to the success of the project. Rondo and CSR worked in conjunction with Cree8 to ensure this happened by conducting regular site visits.
Sponsored
New Street Station, Birmingham

New Street Station, Birmingham

SAS International Australia

Birmingham New Street Station was originally re-built in 1967 to accommodate 650 trains carrying 60,000 passengers per day. By 2010 it had become the busiest station outside of London, operating at more than twice its intended capacity. The first half of the refurbishment was completed in 2013. The station’s recently updated configuration should now accommodate a yearly 8.3% rise in passenger numbers. SAS International commenced work on the three-phase project in June 2012. NG Bailey and main contractor Mace installed SAS systems across the platforms, the shopping centre and the concourse. Full scale, physical mock-ups of the bespoke ceiling solutions were built on-site to ensure design intent prior to installation. The integration of fans for smoke extraction and complex wind loads had to be considered to guarantee passenger safety. The wind loads were a concern as trains passing platforms at speed can cause considerable negative loads. Bespoke ceilings comprising fixed angle bulkheads were installed in line with the curving platforms. The typically trapezoidal bulkheads were bolted end to end in order to form a faceted layout to follow these curves. Using shared data from the project’s BIM model, SAS International used a point cloud to measure the platforms and 3D model the panels. The model’s geometry revealed that the platforms were all non-uniform. This posed a significant design challenge. The data required careful analysis in order to achieve a smooth curved line within the platform edge. This was essential to provide train drivers with an unobstructed view coming into and out of the station. The SAS International design team was able to rationalise the number of unique panel types down to four. This overcame the driver visibility issue, ensured uncompromised aesthetics and brought costs within budget. Electronic Total Station setting-out techniques were then used to set out the panels along the curve.
Sponsored
Fiona Stanley Hospital, WA

Fiona Stanley Hospital, WA

Rondo Building Services Pty Ltd

Rondo has supplied 80,000l/m of DUO Exposed Grid Ceiling System and 148,000 L/M of Steel Stud Drywall Framing System to three of the main buildings. As the design required a variety of special length products, Rondo has been producing large quantities of these items in advance and storing them at the Rondo warehouse in WA to enable quick supply and install for contractors on site, which ensures the project can progress at a rapid rate.
Sponsored
45 Clarence Street

45 Clarence Street

Construction Specialties

45 Clarence St, is a striking office tower located in the busy western corridor of Sydney’s commercial district, with extensive views of Darling Harbour and Barangaroo, it is a prestigious building with various companies operating inside this office building, such as Business Sydney and CBRE.As part of the refurbishment, which included the lobby upgrade, CS worked extensively with the property management team, architect, builder, and installer to deliver the architectural grilles for this project. There was a unique vision to use the Econoline indoors in a commercial building instead of using it as an outdoor vision barrier grille. The focus of this refurbishment was to provide a bespoke architectural grille to line the ceiling and vertical walls of the lobby and modernise the building.The Econoline is typically used in locations such as parking garages, concealing mechanical equipment and for many refacing applications. Having the Econoline installed in a commercial building is a unique opportunity that will result in more products being used for aesthetic purposes. The challenge that was faced with the Econoline being used indoors was that the tapered vertical walls on two sides as grilles needed to be a certain distance above ground level and to be structurally sound.On completion, the lobby at 45 Clarence St Sydney is unique from your typical office building. This is also exciting for CS, to be part of a project that has been transformative and elegant in design.
Sponsored
RMS Parramatta, New South Wales

RMS Parramatta, New South Wales

SAS International Australia

The Roads & Maritime Services (RMS) now benefit from a highly progressive workspace in their newly refurbished head office on Parramatta Street. The main aim of the refurbishment project was to improve facilities and collaborative spaces for staff and visitors. However, a significant challenge for the contractors was to keep all existing communications rooms fully operational throughout the project. Achieving the Aim: SAS800 Trucell ceilings were installed in the open plan lounges and stairwells of the renovation. Creating a grid of squares, strong lines stretch the length and breadth of the collaborative space. The system gives a decorative feature to the fit-out with the illusion of a much larger space for activity-based working. Comfortable lounge furniture and bright colours have also been chosen to encourage communication and create a flexible working space. Meeting the Challenge: Specified with a lay-in exposed grid, each tile slots in place without the need for gaskets or cutting. With the building in constant use, installation was quick and easy keeping the project on schedule with minimal disruption. Popular in Australian CBD property markets, the refit considers occupant well-being with Grade A ‘end of trip’ facilities. An upgraded lobby area also contributes to the value-added space with an improved experience for employees and visitors alike.
Sponsored
The Zephyr, NSW

The Zephyr, NSW

Dyson (Australia)

Memocorp is one of the largest private property groups in Australia. They manage the M Collective – a premium investment grade portfolio spanning commercial, retail and residential properties. Committed to delivering the best spaces and experience for their clients they use workplace design ideologies that harmonise and fascinate. Installing Dyson Supersonic hair dryers and Dyson Airblade V hand dryers, Memocorp found products that not only suited the sleek aesthetic of the luxurious design but also delivered high performance and usability.
Sponsored
Astina Suites Penrith

Astina Suites Penrith

GH Commercial

In collaboration with market leading Astina Group, GH Commercial brought to life luxury design visions with a series of custom flooring solutions.Products:Custom Designer Jet® carpet, 17oz sheetApollo Hardwood Hybrid Flooring, colour 555 Spotted Gum NaturalSpinifex 100% broadloom carpet, colour 91 Sand Storm Custom hand-crafted rugsBuilder: Astina GroupInstaller: Homecare SydneyPhotography: Sebastian Mrugalski Photography
Sponsored
The Well Gym, NSW

The Well Gym, NSW

Dyson (Australia)

The Well is a beautiful sanctuary at Bondi Beach in Sydney’s Eastern Suburbs. The Dyson Airblade V hand dryer has been implemented on this project and it dries hands in just 12 seconds. Yet compared to paper towels, it reduces running costs by up to 99% and produces up to 81% less CO2. It's also hygienic: with HEPA filters installed as standard, it captures 99.95% of particles the size of bacteria from air used to dry hands and does away with paper towel mess.
Sponsored
Leopold Apartments, VIC

Leopold Apartments, VIC

Rondo Building Services Pty Ltd

Occupying a 2134m2 block of premium land, Leopold residential apartments is one of the newest commercial/residential developments in Melbourne’s residential and business district. The project involved the internal demolition of existing commercial fit out, the construction of an additional six levels and the fit-out of 174 residential apartments as well as four office tenancies. The works undertaken comprised of a new wall facade, the attachment of 97 new balconies to the existing structure, and installation of a structural steel transfer level with lightweight floor system (Powerscope).
Sponsored
Whitehorse Towers, VIC

Whitehorse Towers, VIC

Rondo Building Services Pty Ltd

Rondo supported Maxcon Pty Ltd through contractor L&Y Commercial for this project incorporating two 26 and 36 story residential towers of 551 apartments, an Art Series Hotel with 90 rooms, retail spaces and serviced offices. Due to the large-scale nature of the build, our customer was very satisfied with Rondo’s ability to provide quick turnaround times for crane lifts as well as our efficient and effective operation of installation and delivery of goods on site, on time.
Sponsored
Victoria Gardens Shopping Centre, VIC

Victoria Gardens Shopping Centre, VIC

Sculptform

The refurbishment of the Victoria Gardens shopping centre designed by Colab Design Studio uses Sculpform's Aluminium Click-on Batten system to create a stunning curved Oculus, along with feature walls and ceilings throughout the centre. Sculptform’s Click-on batten system provided a unique solution that could be customised to address the incredibly complex geometry of the existing architecture. Being able to use the same system for the mall cladding, mall ceiling installations and the oculus cladding ensured absolute consistency across the entire centre.
Sponsored
All Souls Chapel

All Souls Chapel

Sculptform

A stunning curved ceiling feature brings a refined touch to the All Souls Chapel in Rookwood, NSW. Architects WestonWilliamson+Partners designed a renovation which meets the needs of the many cultures who use the chapel at Rookwood Cemetary. White Oak battens wrap around the beautifully curved ceiling to create a warm and welcoming environment, and aluminium battens on the entrance soffit continue the linear textures externally. The carefully considered design, along with the attention to detail from installer Interfit Projects resulted in an incredible finished product.
Sponsored
Upper Yarra Secondary College

Upper Yarra Secondary College

BRITEX Metal Products

Britex are proud to be involved in another successful VSBA School Upgrade Project at Upper Yarra Secondary College in Yarra Junction, Victoria. The completion of Stage One of the College’s Upgrade and Modernisation Project saw the inclusion of almost 30 Grade 316 SS Acid Resistant Britex Laboratory Bowls for their state of the art science and technology facilities throughout. A floor mounted 3.5m Vandal Resistant Sanistep Urinal was also installed in the Male Bathrooms complete with Smart Saniflush Sensor Flushing System, a water efficient and hygienic choice ideal for education projects.
Sponsored
Span+ (rafter-mounted platform): Multi-level Shopping Complex, ACT

Span+ (rafter-mounted platform): Multi-level Shopping Complex, ACT

Con-form Group

THE CHALLENGE: House 30+ new HVAC&R mechanical plant equipment and vents. Retrofitted to the roof of a large, multi-level shopping centre without interrupting regular retail operations.THE SOLUTION: We supplied over 30 EasyMech MR (purlin mount) and Span+ (rafter mount), HVACR platforms in Kit form.Our Span+ (rafter-mount) system, was designed to be 100% penetration-free and installed on the surface of the roof over the rafters.We also supplied walkways, up & overs, and ladders – all in Kit form! Providing savings in cost and time.
Sponsored
The University of Western Australia, WA

The University of Western Australia, WA

Dyson (Australia)

The University is open every day to thousands of people and its bathrooms in particular have an extremely high footfall. Paper towels, in combination with a few hand dryers, led to considerable unwanted mess and complaints, which in turn also incurred a high, ongoing cost to supply hand towels to all campus bathrooms. Ferguson Architects, who were tasked to refurbish the UWA upgrade suggested the Dyson Airblade Tap hand dryers as the preferred product to install across the 60 bathrooms, due to its combined water tap and hand dryer capabilities. Architect: Ferguson Architects.
Sponsored
RMIT Swanston Street Campus, VIC

RMIT Swanston Street Campus, VIC

Rondo Building Services Pty Ltd

Expoconti and Rondo, along with the project architects, Lysons Architects and builder, Brookfield Multiplex, combined their expertise to ensure the design and construction of the RMIT Swanston Academic Building (SAB) offers a higher quality and innovative learning experience for students. To achieve this, the newly launched Rondo MAXIframe External Wall Framing System was specified, with Rondo MAXIjamb designed for installation around door jambs and internal window openings. This meant Expoconti could save time on site as MAXIjamb replaces the necessity for multiple stud configurations, as well as offering greater performance capacities than traditional wall stud framing.
Sponsored
Riverscape - The Renovation, London

Riverscape - The Renovation, London

Boon Edam Australia Pty Ltd

London is a vibrant, busy and beautiful city, boasting constant innovation and unique architecture. Now, developments have become bigger and more competitive year on year. With expectations on office workspaces becoming increasingly more open and flexible, the requirement for integratable security has become a complex task. This led to the existing building of 10 Queen Street Place, Riverscape to have a much-needed refurbishment following the trend of open atriums, flexible floor space and usable rooftop space. Within this project, the interior and exterior were dramatically changed and enhanced utilising fresh entry and access control security solutions. Located next to Southwark Bridge and a couple minutes’ walk from the bustling area of Cannon Street Station is Riverscape. Originally opened back in 1980, the multi-storey office space was a modern development that sat on the sought-after area of the River Thames. This project was refurbed from top to bottom, with the original Boon Edam entrance solutions being upgraded to newer more innovative products. The lead architect was Aukett Swanke with interior designers Barr Gazetas leading the design of the refurbishment and, main contractors being Overbury. Working for this project years prior in relation to the old security lanes and revolving doors that were installed by Boon Edam, the London Sales team knew the building and requirements needed. It’s common to see dated installations be retrofitted with newer security products that modernise the look and feel of an entrance as well as upgrade the technology associated with them. Download the Case Study for more information about the project.
Sponsored
Rosewood Aged Care

Rosewood Aged Care

Markham Global PTY LTD

There were two sets of challenges involved in the Rosewood Aged Care.Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Preserving a World Heritage Site

Preserving a World Heritage Site

Atlantis

APPLICATION: Road CellPROJECT LOCATION: Chan Chan PeruPROJECT DETAILS: Protecting Walkways and Preventing erosionPROJECT COMPLETION: Sep 2016Chan Chan, the largest City of the pre-Columbian era in South America is now an archaeological site in La Libertad Region, 5 kilometres west of Trujillo Peru. Chan Chan is located in the mouth of the Moche Valley and was the capital of the historical empire of the Chimor from 900 to1470, when they were defeated and incorporated into the Inca Empire. The city Chan Chan spanned 20km2 and had a dense urban centre of 6 km2.The increasing popularity of the site forced the authorities to consider how to protect the walkways and to provide drainage, to remove rain water from the site to prevent erosion. The solution was to use the Atlantis® Road CellTM 53mm drainage cell. This installation made Chan Chan the second World Heritage site in all of Peru to have a highly technical system of protection of the original pavement installed and it covered almost the entire tourist circuit with the exception of the funeral zone.A layer of water proof membrane was laid down on the walkway and the the Atlantis® Road CellTM 53mm drainage cells were clipped together on the water proof membrane and filled with gravel. Thus providing protection for the walkway and also providing a drain for directing rain water away from the archaeological site to ameliorate erosion. Also it facilitated the access of visitors, especially those with disabilities, by providing a firm stable walk way.In all 1,700 m2 of the Atlantis® Road CellTM 53mm drainage cell were laid, and filled with gravel.
Sponsored
Altona Dog Beach Showers, VIC

Altona Dog Beach Showers, VIC

BRITEX Metal Products

Commissioned by Hobson Bay City Council as part of the PA Burns Reserve and Altona Dog Beach Upgrade, Britex supplied a set of purpose built, custom designed Vandal Resistant Stainless Steel Dog Showers. Accessible Drinking Fountains with additional Dog Bowl were also supplied. The Customised Britex Dog Shower supplied included: 4 x Vandal Resistant Stainless Steel Square Dog Showers Manufactured from Marine Grade Stainless Steel Various heights supplied, 800mm and 1200mm options Integrated Lead Connectors • Vandal Resistant Time Flow Tapware Multiple Shower Sets installed at different heights for small and big dogs Integrated Safety Grab Rails

Showing 37-72 of 89

Feedback