NBS Source
I'm a manufacturer

"curtain walling systems"

341 results found

Sort by:

Showing 37-72 of 268

Sponsored
Qantas Headquarters, Mascot, Australia

Qantas Headquarters, Mascot, Australia

SAS International Australia

7000m² of SAS310 helped Qantas Airways overcome acoustic challenges, controling reverberation time and meeting a very high acoustic performance target. Qantas Airways Limited, nicknamed ‘The Flying Kangaroo’, is Australia’s largest airline. The new headquarters is the largest property project undertaken by Qantas Airways in the last 10 years. The project aims to rejuvenate the existing campus, consolidating and upgrading four existing office buildings and joining them together with an interconnecting hub. Selected areas of the existing building floorplate have been extended into the new atrium space creating balconies and office pods. These improved physical and visual connections aim to encourage interaction and engagement between workers. With a brief for high acoustic performance, SAS International were an obvious choice for Hassell architects, due to our vast portfolio of high acoustic rated metal ceiling tiles. SAS provided 7000m² of SAS310. The acoustic challenge was to control the reverberation time in a large volume space accommodating a PA system and a very high acoustic performance target. The reverberation time was significantly reduced with the addition of absorptive material and purposed designed acoustic ceiling panels. Qantas Headquarters was constructed with longevity in mind so the durability of the tiles was key, an advantage of using metal. The finish completely meets the performance demands, is extremely functional and cost effective, an A Grade corporate campus that incorporates the latest developments in sustainability and energy efficiency.
Sponsored
Vision on Morphett, SA

Vision on Morphett, SA

Rondo Building Services Pty Ltd

Working closely with SA Master Plaster as the internal drywall contractor Rondo has supplied 64 & 92mm x 0.70BMT and 92mm x 1.15BMT wall studs for the internal wall framing with over 1,000 studs being required per floor. Also the project is utilising Rondo KEY-LOCK concealed plasterboard framing for ceilings and over 2,000m2 of the external Rondo MAXIframe wall system.
Sponsored
Westin Hotel, WA

Westin Hotel, WA

Rondo Building Services Pty Ltd

Wall types can vary significantly on such a large project, and the Rondo team were required to design a framing system solution that would be suitable for the vast majority of the project. Due to large wall heights to the ballroom areas, Rondo MAXIJamb members were required and specific Rondo engineered design detail was provided for bathroom wall locations, where the Rondo framing was to support stone linings.
Sponsored
No.1 Collins Wharf, VIC

No.1 Collins Wharf, VIC

Rondo Building Services Pty Ltd

No 1. Collins Wharf is the latest part of the $1.2 billion development of the Victoria Harbour precinct. The 29-level apartment complex, built by Lend Lease and designed by Architectural firm, Bates Smart was completed in September this year and boasts 321 water-lined apartments and townhouses. Expoconti were awarded the wall and ceiling contract for the $106M development and soon after contacted Rondo to supply systems for the external walls, external cladding and internal suspended ceiling system.
Sponsored
Bailey Hotel and Resort

Bailey Hotel and Resort

Mapei Australia Pty Ltd

Installation of floor and wall coverings, Sealants application, Surface preparation, Tile & stone installation systems, Waterproofing
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
Eqwater, Paris

Eqwater, Paris

SAS International Australia

Acoustic SAS International metal ceiling systems were installed in the eight-storey Eqwater office building in Paris. SAS International’s SAS330 was installed throughout the office areas in the building. SAS330 is a lay-in metal ceiling tile system that provides functionality and outstanding acoustic performance for a range of cost-effective design options. The practical nature of its structure allows ease of construction and maintenance. The corridors of the building were fitted with SAS International’s SAS205. In some areas it is not possible to use a standard hanging bracket due to the number of services in the ceiling void, SAS205 is supported at the perimeters, up to a maximum width of 3000mm, making it a perfect solution for corridors. Metal offers an inert and inherently hard-wearing surface, making metal ceiling systems both hygienic and a low-maintenance option over the course of their lifespan. Only a simple cleaning routine is required. The lifespan of SAS International’s metal ceilings is in excess of 25 years with only very basic maintenance.
Sponsored
Adelaide Convention Centre, SA

Adelaide Convention Centre, SA

Rondo Building Services Pty Ltd

The project has called on our Technical Services Team for wall and ceiling designs, with significant quantities of Rondo systems used in the project including Rondo Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and PANTHER Access Panels.
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
The Podiums, QLD

The Podiums, QLD

Rondo Building Services Pty Ltd

For instance, Superior faced the challenge of creating curved detailed bulkheads and feature ceilings. However, with Rondo’s help using a hybrid of the Rondo KEY-LOCK Concealed Ceiling System and Stud & Track Wall Framing System, they managed to create a great outcome.
Sponsored
iFly Indoor Skydiving Centre, WA

iFly Indoor Skydiving Centre, WA

Rondo Building Services Pty Ltd

Working directly with sub-contractors Donnybrook Interiors and Architectural Ceiling Systems, Rondo delivered the walls and ceilings for this unique $15million build.
Sponsored
Cavan Training Centre, SA

Cavan Training Centre, SA

Rondo Building Services Pty Ltd

Since the project commenced work in August 2011, Rondo provided technical support by way of weekly site inspections and specified various wall types for the external Steel Stud walls which was utilised throughout the entire building. This coincided with use of the Rondo KEY-LOCK Furring Channel System which also focused on all external and internal ceilings of the building.
Sponsored
Bankwest Stadium, NSW

Bankwest Stadium, NSW

Rondo Building Services Pty Ltd

Rondo has worked alongside Lend Lease to build a stadium that will benefit Western Sydney’s sporting culture immensely. The stadium required continuous onsite reviews including the change of design by our technical team. Rondo’s Steel Stud and Track Wall Framing system was used for the external walls in addition to our Top Hats and Top Hat cleats.
Sponsored
Royal Hobart Hospital, TAS

Royal Hobart Hospital, TAS

Rondo Building Services Pty Ltd

As the project was located in Hobart, it required the project team including Rondo to work together to be organised and keep a clear path of communication. This resulted in the full specification being completed early in the process, the specification included Rondo Wall Stud, KEY LOCK Ceiling Systems, DUO Ceiling Systems, External Soffit Systems and our extensive knowledge on seismic design.
Sponsored
Santiago Airport, Spain

Santiago Airport, Spain

SAS International Australia

A Tricell system was designed by SAS International to fit the "Y" shaped departure lounge at Santiago Airport. SAS International has designed, manufactured and installed metal ceiling solutions for both interior and exterior areas of the new 74,000m² terminal of the Aeropuerto de Santiago, Spain. SAS810 tricell has been installed to create a triangular aesthetic in the departure lounges. This open cell system provides a geometric form that can easily be repeated for a striking finish. The flexible approach in SAS International’s design process enabled this unique solution to fit within the ‘Y’ shaped designed departure lounge. Installed in the main terminal and baggage hall, as well as exterior ceiling areas, is the linear profile system SAS710. The linear slat ceiling, designed so that each slat lines up neatly with the next, forms a perfect row resulting in clean and simple architectural lines. SAS710 was also chosen for the exterior of the building to provide continuity of design. Using specially designed slat retaining angles, the system has been adapted for strength and durability to prevent slats from being dislodged in high wind.
Sponsored
The William, VIC

The William, VIC

Rondo Building Services Pty Ltd

This two-year, $100 million project was undertaken by builders Built, subcontractors Expoconti, and Bruce Henderson Architects for developers Hengyi. Using our MAXIframe External Wall Framing System, we were able to provide a full design specification for the entire external façade that met wind load requirements, also providing one stud wall to accommodate both internal and external linings.
Sponsored
Moonee Ponds, VIC

Moonee Ponds, VIC

Rondo Building Services Pty Ltd

Rondo Technical Representative Tino Cucinotta, worked closely with the 2DG team – and assisted with the supply of QUIET STUD Acoustic Wall System, Stud & Track and Finishing Sections, whilst Rondo’s newly released XPRESS Drywall Grid Ceiling System was due to arrive, ensuring the project could continue efficiently.
Sponsored
State Aquatic Centre, SA

State Aquatic Centre, SA

Rondo Building Services Pty Ltd

This massive project took two years of construction to complete, and Rondo’s technical services team were able to provide design solutions for challenging areas in the project. This included a heavy gauge 150mm Steel Stud Wall Framing System which required alignment with and concealment of the structural frame of the building, and a 6 metre high internal dividing wall that was subjected to higher internal pressures due to the louvres installed.
Sponsored
Versatile 52mm Drainage Cell

Versatile 52mm Drainage Cell

Atlantis

The 52mm drainage cell has been used as normally in two guises. Firstly as a TurfcellTM grass reinforcement such as at Natural Designer Homes , a display home in Casuarina NSW. The photograph of the driveway is from about 1year ago, some 4 years from installation. As there are several cars in the family as well as work trucks the installation looks quite good.Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.However there is a third use for the 52mm drainage cell. That is as walk ways in mining camps. Traymark Industrial Caravans make the vans for accommodation for the workers and Atlantis® 52mm cells are supplied with each van to be used as a walk way to keep workers out of the mud and dirt when at their accommodation..Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.Now for another use: a client already was successfully using our 52mm drainage cell as reinforcement for parking bays beside a river and in August 2011, it occurred to him that he could extend the parking area into a boat ramp. Our 52mm drainage cell is made from recycled polypropylene with U. V. protection, in sheets being 480mm x 260mm x 52mm.Two tracks, being 0.96m in width were connected to the 52mm drainage cell in the parking area and also were secured by metal hook pegs to the drainage cell of the parking area. The tracks lead to a full width ramp (2.88m in width) into the water.To prevent the ramp from sinking fully into the silt, the ramp and adjacent section of the two tracks are formed by two layers of 52mm drainage cell connected to each other by cable ties. Metal hook pegs were also used to assist in holding the ramp in position.We contacted our client in August 2017 and he is very happy with the boat ramp which is still in use despite several floods, and constant exposure to the elements.Thus the high load bearing of approximately 4000t/sq. M and the long useful life of the 52mm drainage cell has permitted the 52mm drainage cell to be used and still being used in many ways.
Sponsored
Crown Towers, WA

Crown Towers, WA

Rondo Building Services Pty Ltd

The tower corridors to the hotel rooms followed a slight curve and the Rondo Technical Services Team were engaged to provide many engineered designs for both internal and external wall framings, as well as internal ceilings and external soffit framings. This included Stud & Track, MAXIframe External Wall Framing System, EXANGLE Finishing Sections and PANTHER Access Panels, all needed to meet the detail required throughout the tower and podium levels.
Sponsored
New Bike Parking Facility For Macquarie University

New Bike Parking Facility For Macquarie University

Cora Bike Rack

Faced with an increasing number of students and staff cycling to campus everyday, FDC Construction was tasked with finding a solution to increase bike parking capacity within the limited parking areas available at Macquarie University latest building project. Using Cora Bike Rack’s fully dynamic E3DT-GT double-tier system, FDC was able to increase the number of secure AS2890.3-compliant bike parking spaces by 120%.
Sponsored
Ferrari World, Abu Dhabi

Ferrari World, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo supplied the Drywall Framing System in the construction of Ferrari World in Abu Dhabi, which is the world’s largest indoor theme park ­– including wall heights that ranged from 9 meters and above.
Sponsored
Health & Innovation Building, SA

Health & Innovation Building, SA

Rondo Building Services Pty Ltd

he developments $247.3m price tag makes it marginally more expensive than the $246m Adelaide University building next door. HIB will house the Centre for Cancer Biology and UniSA’s pharmacy school, with 450 researchers between them. Rondo’s involvement included providing ceiling and wall systems using our Shaftwall One-Way Erected System, KEY-LOCK Concealed Ceiling System and PANTHER Access Panels to create the desired effect.
Sponsored
Kilmore Street Medical Centre, NZ

Kilmore Street Medical Centre, NZ

Rondo Building Services Pty Ltd

Rondo worked with Forman Commercial Interiors and Alpha Holdings on the three storey, $40 million project by providing all of the Steel Stud and Track requirements along with the KEY-LOCK Concealed Suspended Ceiling System. Due to the various wall systems designed, Rondo supplied diagrammatic specifications for the junction details to assist in completing the project, which finished in August this year.
Sponsored
Farr Institute, Edinburgh

Farr Institute, Edinburgh

SAS International Australia

The Farr Institute in Edinburgh is a collaboration between six Scottish Universities and the NHS National Services Scotland. They aim to place the country as a global leader in health informatics research whilst improving the health of the Scottish population. 30,000 sq. ft. has been fitted out to accommodate Bio Incubator laboratories and offices together with meeting, conference and dining facilities. The remainder of the building will accommodate laboratories and offices for life science research. SAS International’s acoustic baffles were specified to meet acoustic demand and make the most of the high ceilings and breathable space. The colours, baffle layout and service integration were carefully co-ordinated to the brief. SAS130 and SAS330 were specified and installed in the central core. Both systems offer quick and easy access to otherwise hidden mechanical and electrical systems. With SAS130, tiles can be lifted out to gain access to the ceiling void. SAS330’s hinge notch allows tiles to be hung vertically from C-Profiles, providing unobstructed access to the ceiling void. Ray Kwiecinski at Michael Laird Architects gave the below quote on working with SAS International; “MLA has specified a variety of SAS International’s lay-in grid ceiling systems over the years and we have always been extremely satisfied with the finished product. At the Farr Institute however, we decided to create a feature of the structural soffits and the M&E services and, by careful coordination of these services, the steel beams… [With] the SAS Baffle System and SAS Raft System 600, we were able to create an open, collaborative and exciting office environment whilst maintaining a high degree of sound absorbency. Our Client is delighted with the results as are we.” The Institute’s independent research will support innovation in the public sector, leading to advances in preventative medicine, improvements in NHS care and better development of commercial drugs and diagnostics.
Sponsored
Victoria Gardens Shopping Centre, VIC

Victoria Gardens Shopping Centre, VIC

Sculptform

The refurbishment of the Victoria Gardens shopping centre designed by Colab Design Studio uses Sculpform's Aluminium Click-on Batten system to create a stunning curved Oculus, along with feature walls and ceilings throughout the centre. Sculptform’s Click-on batten system provided a unique solution that could be customised to address the incredibly complex geometry of the existing architecture. Being able to use the same system for the mall cladding, mall ceiling installations and the oculus cladding ensured absolute consistency across the entire centre.
Sponsored
Icnssc, QLD

Icnssc, QLD

Rondo Building Services Pty Ltd

Rondo worked closely with Wadsworth Contracting providing KEY-LOCK Concealed Ceiling Systems, Panther Access Panels, plastering beads as well as external 92mm framing, soffit framing, internal 76 & 64mm wall framing.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Quest Apartments, WA

Quest Apartments, WA

Rondo Building Services Pty Ltd

The project was subject to wind loading up to 2.8kPa ultimate and 1.9kPa serviceability. Our technical designs specified wall and ceiling systems, as well as complementary accessories to be supplied to the project. Being able to provide tailored designs within a tight deadline was crucial to the project.
Sponsored
ADNOC Head Quarters, Abu Dhabi

ADNOC Head Quarters, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo is proud to be a supplier to ADNOC's new headquarters complex, which will be both a landmark building for the company as well as for the United Arab Emirates. Rondo have supplied the drywall framing as well as a wall cladding system using Rondo Furring Channel and fixing clips.
Sponsored
Canada Bay Primary School

Canada Bay Primary School

RBA Group

The Canada Bay Primary School features the following RBA products:B262 – Paper Towel DispenserB295x14 – Stainless Steel ShelfB4112 – Contura Soap DispenserB6699 – Toilet Roll HolderRBA4090-450 – 90 degree ambulant grab railRBA4040-300 – 40 degree accessible grab rail setRBA4000-060 – 600mm straight grab railRBA4110-990 – Shower Rail Handset & Lever Mixer Complete KitB819687 – Folding Shower SeatRBA4170 Series – Shower Curtain RailB27313 – Triple Toilet Roll HolderB2111 – Vertical Soap DispenserB542 – Cubicle Hook
Sponsored
Bayview, NT

Bayview, NT

Alspec

Combining the ventilation qualities of wide glass louvre windows with the protection of Invisi-Gard security screens ensures this Darwin home stays cool and secure.
Sponsored
Double Tier Parking for Curtin University

Double Tier Parking for Curtin University

Cora Bike Rack

Faced with an increasing number of students and staff cycling to campus everyday, Curtin University reached out to Cora Bike Rack for a solution to increase bike parking capacity within the limited parking areas available. Using the E3DT-GT fully dynamic double tier system, Cora was able to increase the number of secure AS2890.3 compliant bike parking spaces by 120%.
Sponsored
RMIT Swanston Street Campus, VIC

RMIT Swanston Street Campus, VIC

Rondo Building Services Pty Ltd

Expoconti and Rondo, along with the project architects, Lysons Architects and builder, Brookfield Multiplex, combined their expertise to ensure the design and construction of the RMIT Swanston Academic Building (SAB) offers a higher quality and innovative learning experience for students. To achieve this, the newly launched Rondo MAXIframe External Wall Framing System was specified, with Rondo MAXIjamb designed for installation around door jambs and internal window openings. This meant Expoconti could save time on site as MAXIjamb replaces the necessity for multiple stud configurations, as well as offering greater performance capacities than traditional wall stud framing.
Sponsored
Adelaide Botanic High School, SA

Adelaide Botanic High School, SA

Rondo Building Services Pty Ltd

The initial project had been executed in August 2017. Customising the building with KEY-LOCK Suspended Ceiling System, particularly Rondo 155 Furring Chanel which is 48mm wide, and required perforated plasterboard to be attached. Bulkheads, soffit areas and external walls were designed by the Rondo Engineering team.

Showing 37-72 of 268

Feedback